throbber
www.uspto.gov
`
`UNITED STATES DEPARTMENT OF COMMERCE
`United States Patent and Trademark Office
`Address: COMMISSIONER FOR PATENTS
`P.O. Box 1450
`Alexandria, Virginia 2231371450
`
`14/798,861
`
`07/14/2015
`
`Isato IWATA
`
`PIPMM-54714
`
`9049
`
`759°
`52°“
`PEARNE & GORDON LLP
`
`””8ng
`
`1801 EAST 9TH STREET
`SUITE 1200
`
`CLEVELAND, OH 44114-3108
`
`PIERRE LOUIS ANDRE
`
`2123
`
`PAPER NUMBER
`
`NOTIFICATION DATE
`
`DELIVERY MODE
`
`09/18/2018
`
`ELECTRONIC
`
`Please find below and/or attached an Office communication concerning this application or proceeding.
`
`The time period for reply, if any, is set in the attached communication.
`
`Notice of the Office communication was sent electronically on above—indicated "Notification Date" to the
`
`following e—mail address(es):
`
`patdoeket@pearne.eom
`
`PTOL-90A (Rev. 04/07)
`
`

`

`Off/09 A0170” Summary
`
`Application No.
`14/798,861
`Examiner
`ANDRE PIERRE LOUIS
`
`Applicant(s)
`IWATA et al.
`Art Unit
`2123
`
`AIA Status
`Yes
`
`- The MAILING DA TE of this communication appears on the cover sheet wit/7 the correspondence address -
`Period for Reply
`
`A SHORTENED STATUTORY PERIOD FOR REPLY IS SET TO EXPIRE g MONTHS FROM THE MAILING
`DATE OF THIS COMMUNICATION.
`Extensions of time may be available under the provisions of 37 CFR 1.136(a). In no event, however, may a reply be timely filed
`after SIX (6) MONTHS from the mailing date of this communication.
`|f NO period for reply is specified above, the maximum statutory period will apply and will expire SIX (6) MONTHS from the mailing date of this communication.
`-
`- Failure to reply within the set or extended period for reply will, by statute, cause the application to become ABANDONED (35 U.S.C. § 133).
`Any reply received by the Office later than three months after the mailing date of this communication, even if timely filed, may reduce any
`earned patent term adjustment. See 37 CFR 1.704(b).
`
`Status
`
`1). Responsive to communication(s) filed on 08/17/2018.
`[:1 A declaration(s)/affidavit(s) under 37 CFR 1.130(b) was/were filed on
`
`2a)D This action is FINAL.
`
`2b)
`
`This action is non-final.
`
`3)[:] An election was made by the applicant in response to a restriction requirement set forth during the interview on
`; the restriction requirement and election have been incorporated into this action.
`
`4)[:] Since this application is in condition for allowance except for formal matters, prosecution as to the merits is
`closed in accordance with the practice under Expat/7e Quay/e, 1935 CD. 11, 453 O.G. 213.
`
`Disposition of Claims*
`
`5)
`
`Claim(s) fl is/are pending in the application.
`
`5a) Of the above claim(s)
`
`is/are withdrawn from consideration.
`
`E] Claim(s)
`
`is/are allowed.
`
`Claim(s) fl is/are rejected.
`
`[:1 Claim(s) _ is/are objected to.
`
`) ) ) )
`
`6 7
`
`8
`
`
`
`are subject to restriction and/or election requirement
`[j Claim(s)
`9
`* If any claims have been determined aflowabte. you may be eligible to benefit from the Patent Prosecution Highway program at a
`
`participating intellectual property office for the corresponding application. For more information, please see
`
`http://www.uspto.gov/patents/init events/pph/index.jsp or send an inquiry to PPeredback@uspto.gov.
`
`Application Papers
`10)[:] The specification is objected to by the Examiner.
`
`11)[:] The drawing(s) filed on
`
`is/are: a)D accepted or b)l:] objected to by the Examiner.
`
`Applicant may not request that any objection to the drawing(s) be held in abeyance. See 37 CFR 1.85(a).
`Replacement drawing sheet(s) including the correction is required if the drawing(s) is objected to. See 37 CFR 1.121 (d).
`
`Priority under 35 U.S.C. § 119
`12). Acknowledgment is made of a claim for foreign priority under 35 U.S.C. § 119(a)-(d) or (f).
`Certified copies:
`
`a). All
`
`b)I:I Some**
`
`C)C] None of the:
`
`1..
`
`Certified copies of the priority documents have been received.
`
`2.[:]
`
`Certified copies of the priority documents have been received in Application No.
`
`3.[:] Copies of the certified copies of the priority documents have been received in this National Stage
`application from the International Bureau (PCT Rule 17.2(a)).
`
`** See the attached detailed Office action for a list of the certified copies not received.
`
`Attachment(s)
`
`1)
`
`Notice of References Cited (PTO-892)
`
`2) E] Information Disclosure Statement(s) (PTO/SB/08a and/or PTO/SB/08b)
`Paper No(s)/Mail Date_
`U.S. Patent and Trademark Office
`
`3) C] Interview Summary (PTO-413)
`Paper No(s)/Mail Date
`4) CI Other-
`
`PTOL-326 (Rev. 11-13)
`
`Office Action Summary
`
`Part of Paper No./Mai| Date 20180912
`
`

`

`Application/Control Number: 14/798,861
`Art Unit: 2123
`
`Page 2
`
`DETAILED ACTION
`
`Notice ofPre-AIA 0r AIA Status
`
`1.
`
`The present application, filed on or after March 16, 2013, is being examined under the
`
`first inventor to file provisions of the AIA.
`
`2.
`
`A request for continued examination under 37 CFR 1.114, including the fee set forth in
`
`37 CFR 1.17(e), was filed in this application after final rejection. Since this application is
`
`eligible for continued examination under 37 CFR 1.114, and the fee set forth in 37 CFR 1.17(e)
`
`has been timely paid, the finality of the previous Office action has been withdrawn pursuant to
`
`37 CFR 1.114. Applicant's submission filed on 08/ 17/2018 has been entered.
`
`3.
`
`4.
`
`Claims 1—8 are presented for examination.
`
`Regarding the rejection under 35 USC 101, the Examiner withdraws the rejection in view
`
`of the amendment.
`
`Response to Arguments
`
`5.
`
`Applicant's arguments filed 08/17/2018 have been fully considered but they are not
`
`persuasive. As per Applicant’s assertions that: “Amended claim I recites the steps of: (I)
`
`”changing the component data in order to suppress an operational error with respect to a
`
`component type
`
`(2) “executing, after changing the component data, a simulation of a
`
`production cycle time based on a changedproduction data
`
`and (3) “outputting the
`
`improvement plan alone with a production cycle time improvement degree Kurata does not
`
`teach these limitations.
`
`the Examiner respectfully notes that Kurata does provides for changing
`
`the component data as claimed, see Kurata at para 202, which states in the case where the
`
`shipment inventory quantity exceeds the optimum inventory quantity in the simulation results
`
`displayed in S24 and where it is required to change the manufacturing condition so that the
`
`

`

`Application/Control Number: 14/798,861
`Art Unit: 2123
`
`Page 3
`
`shipment inventory quantity will be within the optimum inventory quantity (YES in S48) i.e.
`
`changing component data to suppress any error and optimizing production based on the change
`
`of manufacturing conditions, and the simulation unit 505a acquires the manufacturing condition
`
`(S42), and the processes after the mounting sequence determining process (S 10) are repeated by
`
`an operator inputting the manufacturing condition again with the use of the input unit 303 i. e.
`
`after the change a simulation is executed. Kurata further states that: according to the system
`
`related to the third embodiment, the operator can simulate the shipment inventory by changing
`
`the conditions for the mounting line in various ways. While Kurata does not specifically states
`
`that a production cycle time improvement degree is outputted, Sakamoto, now used as a
`
`secondary reference in the reject, discloses a method for improving production of a mounting
`
`machine including the steps of changing the component data (see abstract) and executing a
`
`simulation after changing the data (see abstract para 40, 45), wherein a comparison is made to
`
`obtain a degree of improvement in the cycle time CT and the CT difference is then outputted (see
`
`abstract, para 43—46), and that the combination of the cited references to Kurata and Sakamoto
`
`clearly render obvious the instant claims limitations.
`
`Claim Rejections - 35 USC § 103
`
`6.
`
`The following is a quotation of 35 USC. 103 which forms the basis for all obviousness
`
`rejections set forth in this Office action:
`
`A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not
`identically disclosed as set forth in section 102, if the differences between the claimed invention and the
`prior art are such that the claimed invention as a whole would have been obvious before the effective
`filing date of the claimed invention to a person having ordinary skill in the art to which the claimed
`invention pertains. Patentability shall not be negated by the manner in which the invention was made.
`
`7.
`
`Claims 1—8 are rejected under 35 USC. 103 as being unpatentable over Kurata et al.
`
`(USPG_PUB No. 2009/0099678), in view of Sakamoto (JP2013—125939A).
`
`

`

`Application/Control Number: 14/798,861
`Art Unit: 2123
`
`Page 4
`
`7.1
`
`In considering claims 1 and 3, Kurata et al. teaches a component mounting
`
`method in a component mounting apparatus, the method comprising:
`
`mounting, by the component mounting apparatus, a component onto a board using a plurality of
`
`pieces of production data linked to component data (see fig.], board A mounting line
`
`manufacturing 200 boards and 150 boards, respectively, see further para 13-17); changing the
`
`component data in order to suppress an operational error with respect to a component type (see
`
`para 201-202, 213-16, 227, in the case where the shipment inventory quantity exceeds the
`
`optimum inventory quantity in the simulation results displayed in S24 and where it is required to
`
`change the manufacturing condition so that the shipment inventory quantity will be within the
`
`optimum inventory quantity (YES in S48), the simulation unit 505a acquires the manufacturing
`
`condition (S42), and the processes after the mounting sequence determining process (S10) are
`
`repeated by an operator inputting the manufacturing condition again with the use ofthe input
`
`unit 303. [0202] As described above, according to the system related to the third embodiment,
`
`the operator can simulate the shipment inventory by changing the conditions for the mounting
`
`line in various ways); executing, after changing the component data, a simulation of a production
`
`cycle time based on the production data (see para 27, the board manufacturing quantity
`
`managing method may also include a manufacturing condition input accepting step of accepting
`
`an input of a manufacturing condition for the mounting line, and a simulation step of causing a
`
`computer to simulate the inventory quantity of boards based on the manufacturing condition, see
`
`further para 20], which states that in the case where the shipment inventory quantity exceeds the
`
`optimum inventory quantity in the simulation results displayed in S24 and where it is required to
`
`change the manufacturing condition so that the shipment inventory quantity will be within the
`
`optimum inventory quantity (YES in S48), the simulation unit 505a acquires the manufacturing
`
`

`

`Application/Control Number: 14/798,861
`Art Unit: 2123
`
`Page 5
`
`condition (S42), and the processes after the mounting sequence determining process (S10) are
`
`repeated by an operator inputting the manufacturing condition again with the use ofthe input
`
`unit 303, and further para 260, 285); comparing a simulation result of the production cycle time
`
`after change of the component data with a production cycle time or a simulation result of the
`
`production cycle time before change of the component data, and outputting a comparison result
`
`(see fig.29 (s608, s614, para 287-290, 299, Next, when the throughput currently achieved by the
`
`mounter 22 is compared with the above target throughput (S608), and when the current
`
`throughput isfaster than the target throughput (S608: current TP>target TP), acceleration is
`
`decreased (S609), and the throughput is recalculated based on the decreased acceleration. Steps
`
`S608 and S609 are repeated until the throughput that is the closest to the target throughput and
`
`not slower than the target throughput is calculated. [0290] On the other hand, when the current
`
`throughput is slower than the target throughput (S608: current TP<target TP), acceleration is
`
`increased (S611), and the throughput is recalculated based on the increased acceleration. In the
`
`case where the recalculated throughput exceeds the limit (S613: Y), a warning is shown in the
`
`display unit 706 (S614)); and making an improvement plan for the production cycle time as a
`
`target based on a simulation result after change of the component data (see para 28, with this
`
`configuration, since it is possible to simulate the inventory quantity in advance, the operator can
`
`determine an optimum manufacturing condition. This makes it possible to reduce cost losses
`
`resulting from shipment inventory or process inventory, more specifically, the apparatus of
`
`Kurata continuously adjusts the throughput. The apparatus first acquires and sets initial data,
`
`such as the number of boards to be manufactured, the time to start manufacturing and the time to
`
`terminate manufacturing (see para [0276] ). This information constitutes production data. The
`
`apparatus then starts manufacturing, i. e. mounting boards on components (para. [0278] ). Then
`
`

`

`Application/Control Number: 14/798,861
`Art Unit: 2123
`
`Page 6
`
`the number of boards to be manufactured is calculated (para. [0279] ). Then the
`
`target throughput (i.e. which is based on cycle time) is calculated (see para [0285]). The current
`
`throughput is compared with the target throughput and adjustments are made, such as
`
`increasing or decreasing the mounting acceleration (i.e. speed). Various issues, such as
`
`downstream checking of the boards determining that some boards are defective, or interruptions
`
`in manufacturing (see para [028]]-[0284]) can cause the number ofboards to be produced to be
`
`updated. This causes a change in the target throughput, which causes a mounting speed change
`
`(i.e. change in component data ), and outputting the improvement plan (see para 29-30, it is
`
`preferable that the board inventory quantity simulation method should further include a graph
`
`display step of displaying, as a graph, the transition of the simulated inventory quantity of
`
`boards. With this configuration, the operator can tell at a glance whether or not the inventory
`
`quantity is optimum, see further para 27], 290).
`
`While Kurata at para 184 states that in $20 of FIG. 17 the mounting takt time level for the
`
`current line is lowered, but he does not specifically teach that a production cycle time
`
`improvement degree is outputted. Sakamoto discloses a method for improving production of a
`
`mounting machine including the steps of changing the component data (see abstract) and
`
`executing a simulation after changing the data (see para 40, 45), wherein a comparison is made
`
`to obtain a degree of improvement in the cycle time CT and the CT difference is then outputted
`
`(see para 43—46).
`
`Kurata and Sakamoto are analogous art because they are from the same field of endeavor and
`
`that the model analyzes by Sakamoto is similar to that of Kurata. Therefore it would have been
`
`obvious at the time of filing of the Applicant’s invention to combine the method of Sakamoto
`
`with that of Kurata because Sakamoto teaches production progress improvement (see para 46).
`
`

`

`Application/Control Number: 14/798,861
`Art Unit: 2123
`
`Page 7
`
`7.2
`
`As per claims 2 and 4, the combined teachings of Kurata et al. and Sakamoto
`
`teach that wherein the improvement plan includes at least one of a change of an operation
`
`sequence of a component mounting operation in which the component is extracted by a suction
`
`nozzle and mounted onto the board, a change in component arrangement in a component supply
`
`section, an addition of a suction nozzle type to be used, and an exchange of a component
`
`arrangement between plural component mounting apparatuses, in the component mounting
`
`apparatus (para 277, 300, this information constitutes production data. The apparatus then starts
`
`manufacturing, i.e. mounting boards on components (see Kutata para. [0278]). Then the number
`
`of boards to be manufactured is calculated (see Kurata para. [0279]). Then the target throughput
`
`(i.e. which is based on cycle time) is calculated (see Kutata para [0285]). The current throughput
`
`is compared with the target throughput and adjustments are made, such as increasing or
`
`decreasing the mounting acceleration (i.e. speed). Various issues, such as downstream checking
`
`of the boards determining that some boards are defective, or interruptions in manufacturing (see
`
`Kurata para [0281]—[0284]) can cause the number of boards to be produced to be updated. This
`
`causes a change in the target throughput, which causes a mounting speed change (i.e. change in
`
`component data).
`
`7.3
`
`As per claim 5, the combined teachings of Kurata et al. and Sakamoto teach that
`
`wherein the operational error comprises a suction error or a mounting position shift with respect
`
`to the component (see Kurata para 290, in the case where the recalculated throughput exceeds the
`
`limit (S613: Y), a warning is shown in the display unit 706 (S614)).
`
`7.4 With regards to claim 6, the combined teachings of Kurata et al. and Sakamoto
`
`teach that wherein the component data comprises a component shape of the component,
`
`component related information indicating a size, a number of leads, lead width and length, and
`
`

`

`Application/Control Number: 14/798,861
`Art Unit: 2123
`
`Page 8
`
`mounting operation condition information that regulates mounting operation conditions of the
`
`component in the component mounting apparatus (see Kurata para 116, 129, the component
`
`library 307b is a library which collects specific information about every component type that the
`
`mounter 22 can deal with, and, as shown in FIG. 10, includes: a component size of each
`
`component type; takt time (the takt time specific to each of the component types under given
`
`conditions) and other restriction information (such as a usable type ofpickup nozzle, a
`
`recognizing method by the component recognizing camera 126, and the maximum speed level for
`
`the multiple mounting head 121), Kurata para [0247], Specifically, this mounter 22 serves as: a
`
`mounter which can mount a variety of electronic components, from a small component to a
`
`connector; a multi-fimction mounter which can mount a large electronic component equal to and
`
`more than 10 mm in length and width, an irregularly-shaped component such as a switch and a
`
`connector, and an IC components such as a Quad Flat Package (QFP) and a Ball Grid Array
`
`(BGA); an apparatus in which the multiple head unit 110 can hold plural electronic components
`
`at a time and transport them from the component supply unit 115 to a point above the board; and
`
`a high-speed mounter which can mount the components at high speed by reducing the
`
`reciprocation frequency of the multiple head unit 110 between the component supply unit 115
`
`and the point above the board).
`
`7.5
`
`Regarding claim 7, the combined teachings of Kurata et al. and Sakamoto teach
`
`that wherein the mounting operation condition information comprises a nozzle type indicating
`
`the type of the suction nozzle corresponding to the type of the component, a suction speed or a
`
`mounting speed that regulates the speed of the component mounting operation, and imaging
`
`conditions including a camera type and an illumination condition used in imaging the component
`
`by a component recognizing camera (see Kurata para 116, 129, the component library 307b is a
`
`

`

`Application/Control Number: 14/798,861
`Art Unit: 2123
`
`Page 9
`
`library which collects specific information about every component type that the mounter 22 can
`
`deal with, and, as shown in FIG. 10, includes: a component size of each component type; takt
`
`time (the takt time specific to each of the component types under given conditions) and other
`
`restriction information (such as a usable type ofpickup nozzle, a recognizing method by the
`
`component recognizing camera 126, and the maximum speed level for the multiple mounting
`
`head 121), para [0247], Specifically, this mounter 22 serves as: a mounter which can mount a
`
`variety of electronic components, from a small component to a connector; a multi-function
`
`mounter which can mount a large electronic component equal to and more than 10 mm in length
`
`and width, an irregularly-shaped component such as a switch and a connector, and an IC
`
`components such as a Quad Flat Package (QFP) and a Ball Grid Array (BGA); an apparatus in
`
`which the multiple head unit 110 can hold plural electronic components at a time and transport
`
`them from the component supply unit 115 to a point above the board; and a high-speed mounter
`
`which can mount the components at high speed by reducing the reciprocation frequency of the
`
`multiple head unit 110 between the component supply unit 115 and the point above the board).
`
`7.6 With regards to claim 8, the combined teachings of Kurata et al. and Sakamoto
`
`teach that wherein an inquiry prompting a determination of whether to employ the improvement
`
`plan for execution is output along with the improvement plan (see Sakamoto para 10, 15; see
`
`further Kurata para 155, 180). Therefore it would have been obvious at the time of filing of the
`
`Applicant’s invention to combine the method of Sakamoto with that of Kurata because Sakamoto
`
`teaches production progress improvement (see para 46).
`
`m
`
`8.
`
`The prior art made of record and not relied upon is considered pertinent to applicant's
`
`disclosure.
`
`

`

`Application/Control Number: 14/798,861
`Art Unit: 2123
`
`Page 10
`
`8.1
`
`Kikuchi et al. (USPG_PUB No. 2003/0023418) teaches a method for simulating
`
`production with electronic—component mounting apparatus.
`
`9.
`
`Claims 1—8 are rejected and THIS ACTION IS Non-FINAL. Any inquiry concerning
`
`this communication or earlier communications from the examiner should be directed to ANDRE
`
`PIERRE LOUIS whose telephone number is (571)272—8636. The examiner can normally be
`
`reached on M—F 8:00 AM—5 :00 PM.
`
`Examiner interviews are available via telephone, in—person, and video conferencing using
`
`a USPTO supplied web—based collaboration tool. To schedule an interview, applicant is
`
`encouraged to use the USPTO Automated Interview Request (AIR) at
`
`http://www.uspto.gov/interviewpractice.
`
`If attempts to reach the examiner by telephone are unsuccessful, the examiner’s
`
`supervisor, Kamini Shah can be reached on 571—272—2279. The fax phone number for the
`
`organization where this application or proceeding is assigned is 571—273—8300.
`
`Information regarding the status of an application may be obtained from the Patent
`
`Application Information Retrieval (PAIR) system. Status information for published applications
`
`may be obtained from either Private PAIR or Public PAIR. Status information for unpublished
`
`applications is available through Private PAIR only. For more information about the PAIR
`
`system, see http://pair—direct.uspto.gov. Should you have questions on access to the Private PAIR
`
`system, contact the Electronic Business Center (EBC) at 866—217—9197 (toll—free).
`
`

`

`Application/Control Number: 14/798,861
`Art Unit: 2123
`
`Page 11
`
`If you would like assistance from a USPTO Customer Service Representative or access to
`
`the automated information system, call 800—786—9199 (IN USA OR CANADA) or 571—272—
`
`1000.
`
`/ANDRE PIERRE LOUIS/
`
`Primary Patent Examiner, Art Unit 2123
`September 13, 2018
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket