`“x
`‘\\f
`
`
`
`UNITED STATES PATENT AND TRADEMARK OFFICE
`
`UNITED STATES DEPARTMENT OF COMMERCE
`United States Patent and Trademark Office
`Address: COMIVHSSIONER FOR PATENTS
`PO. Box 1450
`Alexandria1 Virginia 22313-1450
`www.uspto.gov
`
`
`
`
`
`15/023,386
`
`03/20/2016
`
`KENTARO KURODA
`
`PIPMB—56 168
`
`3147
`
`”90
`52054
`1801 EAST 9TH STREET
`S UITE 1 200
`
`05’04’20” —
`MALIK’ RAHEENA REHMAN
`
`3744
`
`NOTIFICATION DATE
`
`DELIVERY MODE
`
`05/04/2017
`
`ELECTRONIC
`
`Please find below and/or attached an Office communication concerning this application or proceeding.
`
`The time period for reply, if any, is set in the attached communication.
`
`Notice of the Office communication was sent electronically on above—indicated "Notification Date" to the
`following e—mail address(es):
`
`patdocket @ pearne.c0m
`
`PTOL—90A (Rev. 04/07)
`
`
`
`
`
`Applicant(s)
`Application No.
` 15/023,386 KU RODA ET AL.
`
`
`AIA (First Inventor to File)
`Art Unit
`Examiner
`Office Action Summary
`
`
`RAHEENA R. MALIK $2215 3744
`-- The MAILING DA TE of this communication appears on the cover sheet with the correspondence address --
`Period for Reply
`
`A SHORTENED STATUTORY PERIOD FOR REPLY IS SET TO EXPIRE g MONTHS FROM THE MAILING DATE OF
`THIS COMMUNICATION.
`Extensions of time may be available under the provisions of 37 CFR1. 136( a).
`after SIX () MONTHS from the mailing date of this communication.
`If NO period for reply is specified above, the maximum statutory period will apply and will expire SIX (6) MONTHS from the mailing date of this communication.
`-
`- Failure to reply within the set or extended period for reply will, by statute, cause the application to become ABANDONED (35 U.S.C. § 133).
`Any reply received by the Office later than three months after the mailing date of this communication, even if timely filed, may reduce any
`earned patent term adjustment. See 37 CFR 1 .704(b).
`
`In no event, however, may a reply be timely filed
`
`Status
`
`1)IZI Responsive to communication(s) filed on 03/20/2016.
`El A declaration(s)/affidavit(s) under 37 CFR 1.130(b) was/were filed on
`
`2b)|ZI This action is non-final.
`2a)|:l This action is FINAL.
`3)I:I An election was made by the applicant in response to a restriction requirement set forth during the interview on
`
`; the restriction requirement and election have been incorporated into this action.
`
`4)|:| Since this application is in condition for allowance except for formal matters, prosecution as to the merits is
`
`closed in accordance with the practice under Exparte Quay/e, 1935 CD. 11, 453 O.G. 213.
`
`Disposition of Claims*
`
`5)IZI Claim(s) 1-10 is/are pending in the application.
`5a) Of the above claim(s)
`is/are withdrawn from consideration.
`
`is/are allowed.
`6)I:I Claim(s)
`7)|Z| Claim(s)_1-10 is/are rejected.
`8)|:I Claim(s)_ is/are objected to.
`
`
`are subject to restriction and/or election requirement.
`9)I:I Claim((s)
`* If any claims have been determined allowable, you may be eligible to benefit from the Patent Prosecution Highway program at a
`
`participating intellectual property office for the corresponding application. For more information, please see
`hit
`I/'/\WIIW.USOI.O. ovI’ atentS/init events/
`
`
`
`iindex.‘s or send an inquiry to PPI-iieedback{®usgtc.00v.
`
`Application Papers
`
`10)I:l The specification is objected to by the Examiner.
`11)|Xl The drawing(s) filed on 03/20/2016 is/are: a)IXI accepted or b)|:l objected to by the Examiner.
`Applicant may not request that any objection to the drawing(s) be held in abeyance. See 37 CFR 1.85(a).
`
`Replacement drawing sheet(s) including the correction is required if the drawing(s) is objected to. See 37 CFR 1.121 (d).
`
`Priority under 35 U.S.C. § 119
`
`12)IXI Acknowledgment is made of a claim for foreign priority under 35 U.S.C. § 119(a)-(d) or (f).
`Certified copies:
`
`a)IZl All
`
`b)|:l Some” c)I:l None of the:
`
`1.IXI Certified copies of the priority documents have been received.
`2.|:l Certified copies of the priority documents have been received in Application No.
`SIXI Copies of the certified copies of the priority documents have been received in this National Stage
`
`application from the International Bureau (PCT Rule 17.2(a)).
`** See the attached detailed Office action for a list of the certified copies not received.
`
`Attachment(s)
`
`
`
`3) D Interview Summary (PTO-413)
`1) E Notice of References Cited (PTO-892)
`Paper No(s)/Mai| Date.
`.
`.
`4) I:I Other'
`2) E InformatIon DIsclosure Statement(s) (PTO/SB/08a and/or PTO/SB/08b)
`Paper No(s)/Mai| Date
`US. Patent and Trademark Office
`PTOL—326 (Rev. 11-13)
`
`Office Action Summary
`
`Part of Paper No./Mai| Date 20170427
`
`
`
`Application/Control Number: 15/023,386
`
`Art Unit: 3744
`
`Page 2
`
`DETAILED ACTION
`
`Notice of Pre-AIA or AIA Status
`
`1.
`
`The present application, filed on or after March 16, 2013, is being examined under the first
`
`inventor to file provisions of the AIA.
`
`2.
`
`The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for
`
`Claim Rejections - 35 USC § 102
`
`the rejections under this section made in this Office action:
`
`A person shall be entitled to a patent unless —
`
`(a)(1) the claimed invention was patented, described in a printed publication, or in public use,
`on sale or otherwise available to the public before the effective filing date of the claimed
`invention.
`
`3.
`
`Claims 1-10 are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Meyer et al. (US
`
`6,862,892, herein Meyer).
`
`In regards to claim 1, Meyer discloses
`
`An air conditioning device for a vehicle (Fig.2), comprising:
`
`a first water-refrigerant heat exchanger (67) that exchanges heat between a refrigerant of low-
`
`temperature and low-pressure in a heat pump and an engine coolant flowing in an engine coolant path
`
`(62) to vaporize the refrigerant;
`
`a second water-refrigerant heat exchanger (70) that exchanges heat between the refrigerant of
`
`high-temperature and high-pressure in the heat pump and the engine coolant to condense the refrigerant;
`
`and
`
`a first flow rate adjusting unit (Fig.1, 46) that is capable of adjusting a flow rate of the engine
`
`coolant supplied to a flow path connecting with the first water-refrigerant heat exchanger, and a flow rate
`
`of the engine coolant supplied to a flow path bypassing the first water-refrigerant heat exchanger (col.6
`
`lines 3-8).
`
`In regards to claim 2, Meyer discloses a control unit that controls the first flow rate adjusting unit (col.6
`
`lines 3-8), wherein the control unit switches the first flow rate adjusting unit to a state where the engine
`
`
`
`Application/Control Number: 15/023,386
`
`Art Unit: 3744
`
`Page 3
`
`coolant is supplied to a route bypassing the first water-refrigerant heat exchanger (at point 27) when a
`
`pressure of the refrigerant of high-temperature and high-pressure discharged from a compressor for
`
`compressing and discharging the refrigerant is a predetermined pressure or higher in a heat pump
`
`heating mode where the refrigerant of the heat pump is supplied to both the first water-refrigerant heat
`
`exchanger and the second water-refrigerant heat exchanger (Fig.2).
`
`In regards to claim 3, Meyer discloses that the control unit switches the first flow rate adjusting unit to a
`
`state where a part of the engine coolant is supplied to the route bypassing the first water-refrigerant heat
`
`exchanger (through point 27).
`
`In regards to claim 4, Meyer discloses that the control unit allows the first flow rate adjusting unit to
`
`increase a flow rate of the engine coolant flowing along the route bypassing the first water-refrigerant heat
`
`exchanger in accordance with a rise in the pressure of the refrigerant of high-temperature and high-
`
`pressure when the pressure of the refrigerant of high-temperature and high-pressure refrigerant
`
`discharged from the compressor is the predetermined pressure or higher (col.6 lines 3-8).
`
`In regards to claim 5, Meyer discloses a control unit that controls the first flow rate adjusting unit (col.6
`
`lines 3-8), wherein the control unit switches the first flow rate adjusting unit to a state where the engine
`
`coolant is supplied to a route bypassing the first water-refrigerant heat exchanger (at point 27) when a
`
`temperature of the engine coolant passing through the second water-refrigerant heat exchanger is a
`
`predetermined temperature or higher in a heat pump heating mode where the refrigerant of the heat
`
`pump is supplied to both the first water-refrigerant heat exchanger and the second water-refrigerant heat
`
`exchanger (Fig.2).
`
`In regards to claim 6, Meyer discloses that the control unit switches the first flow rate adjusting unit to a
`
`state where a part of the engine coolant is supplied to the route bypassing the first water-refrigerant heat
`
`exchanger (through point 27).
`
`In regards to claim 7, Meyer discloses that the control unit allows the first flow rate adjusting unit to
`
`increase a flow rate of the engine coolant flowing along the route bypassing the first water-refrigerant heat
`
`exchanger in accordance with a rise in the temperature of the engine coolant when the temperature of the
`
`
`
`Application/Control Number: 15/023,386
`
`Art Unit: 3744
`
`Page 4
`
`engine coolant passing through the second water-refrigerant heat exchanger is the predetermined
`
`temperature or higher (col.6 lines 3-8).
`
`In regards to claim 8, Meyer discloses an evaporator (38) that exchanges heat between the refrigerant
`
`of low-temperature and low-pressure and intake air to be supplied to a vehicle interior; and
`
`a condenser (76) that receives a flow of the refrigerant of high-temperature and high-pressure,
`
`and releases heat from the refrigerant of high-temperature and high-pressure to outside air, wherein a
`
`refrigerant path extending from the second water-refrigerant heat exchanger to the first water-refrigerant
`
`heat exchanger is different from a refrigerant path extending from the condenser to the evaporator (Fig.2).
`
`In regards to claim 9, Meyer discloses a compressor (72) that compresses the refrigerant; and a check
`
`valve (80) disposed between the compressor and the evaporator in a refrigerant circuit.
`
`In regards to claim 10, Meyer discloses a first expansion unit that expands the refrigerant delivered from
`
`the second water-refrigerant heat exchanger, and delivers the expanded refrigerant to the first water-
`
`refrigerant heat exchanger (Abstract, second expansion device); and a second expansion unit that
`
`expands the refrigerant condensed by the condenser, and discharges the expanded refrigerant to the
`
`evaporator (Abstract, first expansion device).
`
`Conclusion
`
`4.
`
`The prior art made of record and not relied upon is considered pertinent to applicant's disclosure.
`
`US 6,640,889 disclose an air conditioning device for a vehicle.
`
`Any inquiry concerning this communication or earlier communications from the examiner should
`
`be directed to RAHEENA R. MALIK whose telephone number is (571)272-2994. The examiner can
`
`normally be reached on M-F 8:30-5:00.
`
`Examiner interviews are available via telephone, in-person, and video conferencing using a
`
`USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use
`
`the USPTO Automated lnterview Request (AIR) at http://www.uspto.gov/interviewpractice.
`
`
`
`Application/Control Number: 15/023,386
`
`Art Unit: 3744
`
`Page 5
`
`If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor,
`
`Jianying Atkisson can be reached on (571) 270-7740. The fax phone number for the organization where
`
`this application or proceeding is assigned is 571 -273-8300.
`
`Information regarding the status of an application may be obtained from the Patent Application
`
`Information Retrieval (PAIR) system. Status information for published applications may be obtained from
`
`either Private PAIR or Public PAIR. Status information for unpublished applications is available through
`
`Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should
`
`you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC)
`
`at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative
`
`or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571 -272-
`
`1000.
`
`/RAHEENA R MALIK/
`
`Examiner, Art Unit 3744
`
`