throbber
www.uspto.gov
`
`UNITED STATES DEPARTMENT OF COMMERCE
`United States Patent and TrademarkOffice
`Address; COMMISSIONER FOR PATENTS
`P.O. Box 1450
`Alexandria, Virginia 22313-1450
`
`16/853,030
`
`04/20/2020
`
`TETSUYA YAMAMOTO
`
`731456.422C3
`
`9973
`
`Seed IP Law Group LLP/Panasonic (PIPCA)
`701 5th Avenue, Suite 5400
`Seattle, WA 98104
`
`MOORE JR, MICHAEL J
`
`ART UNIT
`
`2467
`
`PAPER NUMBER
`
`NOTIFICATION DATE
`
`DELIVERY MODE
`
`05/17/2022
`
`ELECTRONIC
`
`Please find below and/or attached an Office communication concerning this application or proceeding.
`
`The time period for reply, if any, is set in the attached communication.
`
`Notice of the Office communication was sent electronically on above-indicated "Notification Date" to the
`following e-mail address(es):
`USPTOeAction @ SeedIP.com
`
`pairlinkdktg @seedip.com
`
`PTOL-90A (Rev. 04/07)
`
`

`

`Application No.
`Applicant(s)
`16/853,030
`YAMAMOTOetal.
`
`Office Action Summary Art Unit|AIA (FITF) StatusExaminer
`MICHAEL J MOORE JR
`2467
`Yes
`
`
`
`-- The MAILING DATEofthis communication appears on the cover sheet with the correspondence address --
`Period for Reply
`
`A SHORTENED STATUTORY PERIOD FOR REPLYIS SET TO EXPIRE 3 MONTHS FROM THE MAILING
`DATE OF THIS COMMUNICATION.
`Extensions of time may be available underthe provisions of 37 CFR 1.136(a). In no event, however, may a reply betimely filed after SIX (6) MONTHSfrom the mailing
`date of this communication.
`If NO period for reply is specified above, the maximum statutory period will apply and will expire SIX (6) MONTHSfrom the mailing date of this communication.
`-
`- Failure to reply within the set or extended period for reply will, by statute, cause the application to become ABANDONED (35 U.S.C. § 133}.
`Any reply received by the Office later than three months after the mailing date of this communication, evenif timely filed, may reduce any earned patent term
`adjustment. See 37 CFR 1.704(b).
`
`Status
`
`
`
`1) Responsive to communication(s)filed on 3/1/22.
`C} A declaration(s)/affidavit(s) under 37 CFR 1.130(b) was/werefiled on
`2a)¥) This action is FINAL.
`2b) (J This action is non-final.
`3)02 An election was madeby the applicant in responseto a restriction requirement set forth during the interview
`on
`; the restriction requirement and election have been incorporated into this action.
`4\0) Since this application is in condition for allowance except for formal matters, prosecution as to the merits is
`closed in accordance with the practice under Exparte Quayle, 1935 C.D. 11, 453 O.G. 213.
`
`Disposition of Claims*
`1-16 is/are pending in the application.
`)
`Claim(s)
`5a) Of the above claim(s) ___ is/are withdrawn from consideration.
`C] Claim(s)__ is/are allowed.
`Claim(s) 1-16 is/are rejected.
`(1 Claim(s)__is/are objectedto.
`C} Claim(s)
`are subjectto restriction and/or election requirement
`* If any claims have been determined allowable, you maybeeligible to benefit from the Patent Prosecution Highway program at a
`participating intellectual property office for the corresponding application. For more information, please see
`http://www.uspto.gov/patents/init_events/pph/index.jsp or send an inquiry to PPHfeedback@uspto.gov.
`
`) ) ) )
`
`Application Papers
`10) The specification is objected to by the Examiner.
`11)0) The drawing(s) filedon__ is/are: a)(J accepted or b)() objected to by the Examiner.
`Applicant may not request that any objection to the drawing(s) be held in abeyance. See 37 CFR 1.85(a).
`Replacement drawing sheet(s) including the correction is required if the drawing(s) is objected to. See 37 CFR 1.121 (d).
`
`Priority under 35 U.S.C. § 119
`12)[M) Acknowledgment is made of a claim for foreign priority under 35 U.S.C. § 119(a)-(d)or (f).
`Certified copies:
`c)Z None ofthe:
`b)() Some**
`a) All
`1.{¥] Certified copies of the priority documents have been received.
`2.1.) Certified copies of the priority documents have been received in Application No.
`3.1.) Copies of the certified copies of the priority documents have been receivedin this National Stage
`application from the International Bureau (PCT Rule 17.2(a)).
`* See the attached detailed Office action for a list of the certified copies not received.
`
`Attachment(s)
`
`1) ([] Notice of References Cited (PTO-892)
`
`2) (J Information Disclosure Statement(s) (PTO/SB/08a and/or PTO/SB/08b)
`Paper No(s)/Mail Date
`U.S. Patent and Trademark Office
`
`3) (J Interview Summary (PTO-413)
`Paper No(s)/Mail Date
`(Qj Other:
`
`4)
`
`PTOL-326 (Rev. 11-13)
`
`Office Action Summary
`
`Part of Paper No./Mail Date 20220512
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 2
`
`Notice of Pre-AlA or AIA Status
`
`1.
`
`The present application, filed on or after March 16, 2013, is being examined
`
`under the first inventor to file provisions of the AIA.
`
`Claim Rejections - 35 USC § 102
`
`2.
`
`In the event the determination of the status of the application as subject to AIA 35
`
`U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103)is incorrect, any
`
`correction of the statutory basis for the rejection will not be considered a new ground of
`
`rejection if the prior art relied upon, and the rationale supporting the rejection, would be
`
`the same under either status.
`
`3.
`
`The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that
`
`form the basis for the rejections under this section madein this Office action:
`
`A personshall be entitled to a patent unless —
`
`(a)(2) the claimed invention was described in a patent issued under section 151, or in an
`application for patent published or deemed published under section 122(b), in which the
`patent or application, as the case may be, namesanother inventor and waseffectively filed
`before the effective filing date of the claimed invention.
`
`4.
`
`Claim(s) 1, 5, 9, and 13 is/are rejected under 35 U.S.C. 102(a)(2) as being
`
`anticipated by Chen et al. (U.S. 2016/0337089) (hereinafter “Chen”). Chen teachesall
`
`of the limitations of the specified claims with the reasoning that follows.
`
`Regarding claim 1, “a terminal comprising: a receiver, which, in operation,
`
`receives repetitions of a control signal across a plurality of first subframes and a data
`
`signal allocated to a resource indicated by the control signal” is anticipated by the
`
`terminal shown in Figure 7 that includes a receiving module (receiver), where downlink
`
`allocation information (control signal) is repetitively transmitted through a PDCCH ina
`
`plurality of continuous downlink sub-frames to the terminal, and downlink service data
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 3
`
`(data signal) is repetitively transmitted through a PDSCH in a plurality of continuous
`
`downlink sub-frames to the terminal as spoken of on page 2, paragraph [0011], lines 18-
`
`25.
`
`Lastly, “a transmitter, which, in operation, transmits a response signal for the
`
`data signal with repetitions across a plurality of second subframes on resource blocks
`
`that are determined from one of indexesof the plurality of first subframes” is anticipated
`
`by the terminal shownin Figure 7 that includes a transmitting module (transmitter),
`
`where HARQ-ACK feedbackinformation (response signal) is repetitively transmitted
`
`through a PUCCH format 1a/1b channel in a plurality of continuous uplink sub-frames
`
`(second subframes) as spoken of on page 2, paragraph [0011], lines 22-25; where each
`
`sub-frame of the system reserves at least one PUCCH resource for PUCCH, each
`
`PUCCH resource occupying two resource blocks respectively located in two time slots
`
`of a sub-frame as spoken of on page 1, paragraphs [0005]-[0006]; where a PUCCH is
`
`determined by preset resources such as control channel elements occupied by the
`
`PDCCH asspoken of on page 3, paragraphs [0034]-[0036]; where a subframeutilized
`
`by a PDCCH includes a number of control channel elements (CCEs) as shownin Figure
`
`10 and spoken of on page 11, paragraph [0251]; and where the preset resources for the
`
`PUCCH are determined according to the index of the first CCE occupied by the
`
`
`
`PDCCH, the number of the CCEs and the number of the indexof the first subframe,
`
`
`
`
`subframes, etc. as spoken of on page 3, paragraphs [0037], [0039], and [0054].
`
`Regarding claim 5, “a base station, comprising: a transmitter, which, in
`
`operation, transmits repetitions of a control signal across a plurality of first subframes
`
`and a data signal allocated to a resource indicated by the control signal” is anticipated
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 4
`
`by the base station shownin Figure 7 that includes a transmitting module (transmitter),
`
`where downlink allocation information (control signal) is repetitively transmitted through
`
`a PDCCH in a plurality of continuous downlink sub-framesby the basestation, and
`
`downlink service data (data signal) is repetitively transmitted through a PDSCH ina
`
`plurality of continuous downlink sub-frames by the base station as spoken of on page 2,
`
`paragraph [001 1], lines 18-25.
`
`Lastly, “a receiver, which, in operation, receives a responsesignal for the data
`
`signal, which is transmitted with repetitions across a plurality of second subframes on
`
`resource blocks that are determined from one of indexes of the plurality offirst
`
`subframes’is anticipated by the base station shownin Figure 7 that includes a receiving
`
`module (receiver), where HARQ-ACK feedbackinformation (response signal) is
`
`repetitively transmitted through a PUCCH format 1a/1b channel in a plurality of
`
`continuous uplink sub-frames (second subframes) as spoken of on page 2, paragraph
`
`[0011], lines 22-25; where each sub-frame of the system reserves at least one PUCCH
`
`resource for PUCCH, each PUCCH resource occupying two resource blocks
`
`respectively located in two time slots of a sub-frame as spoken of on page 1,
`
`paragraphs [0005]-[0006]; where a PUCCH is determined by preset resources such as
`
`control channel elements occupied by the PDCCH as spoken of on page 3, paragraphs
`
`[0034]-[0036]; where a subframe utilized by a PDCCH includes a number of control
`
`channel elements (CCEs) as shownin Figure 10 and spoken of on page 11, paragraph
`
`[0251]; and where the preset resources for the PUCCH are determined according to the
`
`index of the first CCE occupied by the PDCCH, the index of the first subframe, the
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 5
`
`number of the CCEs and the number of subframes, etc. as spoken of on page 3,
`
`paragraphs [0037], [0039], and [0054].
`
`Regarding claim 9, “receiving repetitions of a control signal across a plurality of
`
`first subframes and a data signal allocated to a resource indicated by the control signal”
`
`is anticipated by the terminal shown in Figure 7 that includes a receiving module
`
`(receiver), where downlink allocation information (control signal) is repetitively
`
`transmitted through a PDCCH in a plurality of continuous downlink sub-frames to the
`
`terminal, and downlink service data (data signal) is repetitively transmitted through a
`
`PDSCH in a plurality of continuous downlink sub-framesto the terminal as spoken of on
`
`page 2, paragraph [0011], lines 18-25.
`
`Lastly, “transmitting a response signal for the data signal with repetitions across
`
`a plurality of second subframes on resource blocks that are determined from one of
`
`indexesof the plurality of first subframes’” is anticipated by the terminal shownin Figure
`
`7 that includes a transmitting module (transmitter), where HARQ-ACK feedback
`
`information (responsesignal) is repetitively transmitted through a PUCCH format 1a/1b
`
`channel in a plurality of continuous uplink sub-frames (second subframes) as spoken of
`
`on page 2, paragraph [0011], lines 22-25; where each sub-frame of the system reserves
`
`at least one PUCCH resource for PUCCH, each PUCCH resource occupying two
`
`resource blocks respectively located in two time slots of a sub-frame as spoken of on
`
`page 1, paragraphs [0005]-[0006]; where a PUCCH is determined by preset resources
`
`such as control channel elements occupied by the PDCCH as spoken of on page 3,
`
`paragraphs [0034]-[0036]; where a subframe utilized by a PDCCH includes a number of
`
`control channel elements (CCEs) as shown in Figure 10 and spoken of on page 11,
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 6
`
`paragraph [0251]; and wherethe preset resources for the PUCCH are determined
`
`according to the index of the first CCE occupied by the PDCCH, the indexof the first
`
`
`
`subframe, the number of the CCEs and the number of subframes, etc. as spoken of on
`
`page 3, paragraphs [0037], [0039], and [0054].
`
`Regarding claim 13, “transmitting repetitions of a control signal across a plurality
`
`of first subframes and a data signal allocated to a resource indicated by the control
`
`signal” is anticipated by the base station shown in Figure 7 that includes a transmitting
`
`module (transmitter), where downlink allocation information (control signal) is
`
`repetitively transmitted through a PDCCH in a plurality of continuous downlink sub-
`
`frames by the base station, and downlink service data (data signal) is repetitively
`
`transmitted through a PDSCH in a plurality of continuous downlink sub-frames by the
`
`base station as spoken of on page 2, paragraph [0011], lines 18-25.
`
`Lastly, “receiving a response signal for the data signal, which is transmitted with
`
`repetitions across a plurality of second subframes on resource blocks that are
`
`determined from associated one of indexes ofthe plurality of first subframes”is
`
`anticipated by the base station shownin Figure 7 that includes a receiving module
`
`(receiver), where HARQ-ACK feedbackinformation (responsesignal) is repetitively
`
`transmitted through a PUCCH format 1a/1b channel in a plurality of continuous uplink
`
`sub-frames (second subframes) as spoken of on page 2, paragraph [0011], lines 22-25;
`
`where each sub-frame of the system reserves at least one PUCCH resource for
`
`PUCCH, each PUCCH resource occupying two resource blocks respectively located in
`
`two time slots of a sub-frame as spoken of on page 1, paragraphs [0005]-[0006]; where
`
`a PUCCH is determined by preset resources such as control channel elements
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 7
`
`occupied by the PDCCH as spokenof on page 3, paragraphs [0034]-[0036]; where a
`
`subframe utilized by a PDCCH includes a number of control channel elements (CCEs)
`
`as shownin Figure 10 and spoken of on page 11, paragraph [0251]; and where the
`
`preset resourcesfor the PUCCH are determined according to the index of the first CCE
`
`occupied by the PDCCH, the index of the first subframe, the number of the CCEs and
`
`the number of subframes, etc. as spoken of on page 3, paragraphs [0037], [0039], and
`
`[0054].
`
`Claim Rejections - 35 USC § 103
`
`5.
`
`In the event the determination of the status of the application as subject to AIA 35
`
`U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103)is incorrect, any
`
`correction of the statutory basis for the rejection will not be considered a new ground of
`
`rejection if the prior art relied upon, and the rationale supporting the rejection, would be
`
`the same under either status.
`
`6.
`
`The following is a quotation of 35 U.S.C. 103 which forms the basis for all
`
`obviousnessrejections setforth in this Office action:
`
`A patent for a claimed invention may not be obtained, notwithstanding that the claimed
`invention is not identically disclosed as set forth in section 102, if the differences between the
`claimed invention and the prior art are such that the claimed invention as a whole would have
`been obvious before the effective filing date of the claimed invention to a person having
`ordinary skill in the art to which the claimed invention pertains. Patentability shall not be
`negated by the manner in which the invention was made.
`
`7.
`
`This application currently names joint inventors. In considering patentability of the
`
`claims the examiner presumes that the subject matter of the various claims was
`
`commonly ownedasof the effective filing date of the claimed invention(s) absent any
`
`evidenceto the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to
`
`point out the inventor and effective filing dates of each claim that was not commonly
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 8
`
`ownedas ofthe effectivefiling date of the later invention in order for the examiner to
`
`consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2)
`
`prior art against the later invention.
`
`8.
`
`Claims 2-4, 6-8, 10-12, and 14-16 is/are rejected under 35 U.S.C. 103 as being
`
`unpatentable over Chen in view of Earnshawetal. (U.S. 2013/0235768) (hereinafter
`
`“Earnshaw’).
`
`Regarding claims 2, 6, 10, and 14, Chen teachesclaims 1, 5, 9, and 13 as
`
`described above. While Chen also teaches where spacing between the last sub-frame
`
`occupied by the PDSCH andastarting sub-frame occupied by the PUCCH format 1a/1b
`
`channel is in total three subframes (indicates subframe period) as spoken of on page 2,
`
`paragraph [0011], lines 25-31, Chen doesnot explicitly teach “wherein a numberof the
`
`repetitions of the response signal is an integer multiple of a subframe period in which
`
`transmission of the response signal with repetitions is started”.
`
`However, Earnshaw teaches a system and methodfor handling scheduling
`
`requestcollisions with an ACK/NACK repetition signal where a value of a scheduling
`
`requestprohibit timer may be configured to represent a multiple of the scheduling
`
`request periodicity (subframe period), which may be equal to a scheduling request
`
`period multiplied by an integer (integer multiple) in the range from 0 to 7, inclusive, such
`
`that a collision with a ACK/NACK repetition sequence (response signal) may be avoided
`
`as spoken of on pages 5-6, paragraph [0038].
`
`Given the abovereferences, it would have been obvious to someoneof ordinary
`
`skill in the art, before the effectivefiling date of the invention, to apply the ACK/NACK
`
`repetition signal handling of Earnshaw to the system of Chenin order to improve the
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 9
`
`reliability of the communication system by reducing the possibility of collisions between
`
`ACK/NACK responsesignaling and other control messaging as spoken of on pages 5-6,
`
`paragraph [0038] of Earnshaw.
`
`Regarding claims 3, 4, 7, 8, 11, 12, 15, and 16, Chen teachesclaims 1, 5, 9, and
`
`13 as described above. While Chen also teaches where each sub-frame of the system
`
`reserves at least one PUCCH resource for PUCCH, each PUCCH resource occupying
`
`two resource blocks respectively located in two time slots of a sub-frame (one-to-one
`
`association) as spoken of on page 1, paragraph [0005], as well as where a PUCCH is
`
`determined by preset resources such as control channel elements occupied by the
`
`PDCCH (one-to-one association) as spoken of on page 3, paragraphs [0034]-[0036],
`
`Chen does notexplicitly teach “wherein a number of the repetitions of the response
`
`signal is an integer multiple of a subframe period in which transmission of the response
`
`signal with repetitions is started, and the plurality of first subframes per the subframe
`
`period are associated one-to-one with the resource blocks’ or “wherein a number of the
`
`repetitions of the response signal is an integer multiple of a subframe period in which
`
`transmission of the responsesignal with repetitions is started, and the plurality of
`
`second subframes per the subframe period are associated one-to-one with the resource
`
`blocks”.
`
`However, Earnshaw teaches a system and method for handling scheduling
`
`requestcollisions with an ACK/NACK repetition signal where a value of a scheduling
`
`requestprohibit timer may be configured to represent a multiple of the scheduling
`
`request periodicity (subframe period), which may be equal to a scheduling request
`
`period multiplied by an integer (integer multiple) in the range from 0 to 7, inclusive, such
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 10
`
`that a collision with a ACK/NACK repetition sequence (response signal) may be avoided
`
`as spoken of on pages 5-6, paragraph [0038].
`
`Given the abovereferences, it would have been obvious to someoneof ordinary
`
`skill in the art, before the effective filing date of the invention, to apply the ACK/NACK
`
`repetition signal handling of Earnshaw to the system of Chen in order to improve the
`
`reliability of the communication system by reducing the possibility of collisions between
`
`ACK/NACK responsesignaling and other control messaging as spoken of on pages 5-6,
`
`paragraph [0038] of Earnshaw.
`
`Responseto Arguments
`
`9.
`
`Applicant's argumentsfiled 3/1/22 have been fully considered but they are not
`
`persuasive.
`
`Regarding amendedclaims 1, 5, 9, and 13, Applicant argues that Chen does not
`
`teach “a responsesignal for the data signal with repetitions across a plurality of second
`
`subframes on resource blocks that are determined from one of indexes of the plurality of
`
`first subframes”. Applicant also asserts that while one subframe includes a plurality of
`
`CCEs, and that eachof the plurality of CCEs is associated with a respective PUCCH
`
`resource, and that the respective PUCCH resource can be determined from each CCE
`
`
`(as taught in Chen), one PUCCH resource cannot be determined from each subframe
`
`because each subframe is associated with a plurality of PUCCH resources rather than
`
`one PUCCH resource.
`
`Examiner respectfully disagrees.
`
`As providedin the previous Office Action, since Chen teaches a PUCCH usedfor
`
`HARQ-ACK thatis determined from CCEs of the PDCCH usedfor control signaling, it
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 11
`
`follows that Chen also teaches that the PUCCH is determined from a subframe of the
`
`PDCCH since the CCEsare part of the subframe as shownin Figure 10 and spoken of
`
`on page 11, paragraph [0251] of Chen.
`
`In other words, it is Examiner’s understanding
`
`that the determination of the PUCCH from a CCE of a corresponding PDCCH would
`
`also be a determination of the PUCCH from a subframeincluding that particular CCE.
`
`As noted by Applicant, Chen describes where one subframe includesat least
`
`CCE #1 and CCE #2, where CCE #1 is associated with PUCCH #10, and CCE #2 is
`
`associated with PUCCH #20. Therefore, either or both of PUCCH #10 and PUCCH #20
`
`could be determined from the one subframe as the subframe includes both CCE #1 and
`
`CCE #2information that are associated with their corresponding PUCCH.
`
`Also, as described above, Chen further teaches where the preset resourcesfor
`
`the PUCCH are determined according to the index of the first CCE occupied by the
`
`PDCCH, the index of the first subframe, the number of the CCEs and the number of
`
`subframes, etc. as spoken of on page 3, paragraphs [0037], [0039], and [0054].
`
`Using a broadest reasonable interpretation of the current claim language, it is
`
`maintained that Chen teaches the abovelimitation in question.
`
`Conclusion
`
`10.
`
`Applicant's amendment necessitated the new ground(s) of rejection presented in
`
`this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP
`
`§ 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37
`
`CFR 1.136(a).
`
`A shortenedstatutory period for reply to this final action is set to expire THREE
`
`MONTHS from the mailing date of this action.
`
`In the eventa first reply is filed within
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 12
`
`TWO MONTHS ofthe mailing date ofthis final action and the advisory action is not
`
`mailed until after the end of the THREE-MONTH shortenedstatutory period, then the
`
`shortenedstatutory period will expire on the date the advisory action is mailed, and any
`
`extension fee pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of
`
`the advisory action.
`
`In no event, however, will the statutory period for reply expire later
`
`than SIX MONTHS from the date of this final action.
`
`11.
`
`Any inquiry concerning this communication or earlier communications from the
`
`examiner should be directed to MICHAEL J. MOORE, JR., whose telephone number is
`
`(571)272-3168. The examiner can normally be reached M-F (9am-4pm).
`
`Examiner interviews are available via telephone, in-person, and video
`
`conferencing using a USPTO supplied web-basedcollaboration tool. To schedule an
`
`interview, applicant is encouraged to use the USPTO Automated Interview Request
`
`(AIR) at http:/Awww.uspto.gov/interviewpractice.
`
`If attempts to reach the examiner by telephone are unsuccessful, the examiner's
`
`supervisor, Hassan A. Phillips can be reached at (571)272-3940. The fax phone number
`
`for the organization where this application or proceeding is assigned is 571-273-8300.
`
`Information regarding the status of published or unpublished applications may be
`
`obtained from Patent Center. Unpublished application information in Patent Center is
`
`available to registered users. To file and manage patent submissions in Patent Center,
`
`visit: https://patentcenter.uspto.gov. Visit https:/Awww.uspto.gov/patents/apply/patent-
`
`center for more information about Patent Center and
`
`https:/Awww.uspto.gov/patents/docx for information aboutfiling in DOCX format. For
`
`

`

`Application/Control Number: 16/853,030
`Art Unit: 2467
`
`Page 13
`
`additional questions, contact the Electronic Business Center (EBC) at 866-217-9197
`
`(toll-free). If you would like assistance from a USPTO Customer Service
`
`Representative, call 800-786-9199 (IN USA OR CANADA)or 571-272-1000.
`
`/MICHAEL J MOORE JR/
`Primary Examiner, Art Unit 2467
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket