`UNITED STATES PATENT AND TRADEMARK OFFICE
`
`UNITED STATES DEPARTMENT OF COMMERCE
`United States Patent and Trademark Office
`Address: COMMISSIONER FOR PATENTS
`P.O. Box 1450
`Alexandria1 Virginia 22313- 1450
`wwwnsptogov
`
`APPLICATION NO.
`
`
`
`
`
` F ING DATE
`
`FIRST NAMED INVENTOR
`
`ATTORNEY DOCKET NO.
`
`
`
`
`
`CONF {MATION NO.
`
`12/ 177,442
`
`07/22/2008
`
`P. Subramanya Herle
`
`PESL—108US
`
`4442
`
`EXAMINER
`RATNERPRESTIA —
`”3’20” —
`7590
`52473
`PO. BOX 980
`LAIos, MARIAI
`VALLEY FORGE, PA 19482-0980
`
`PAPER NUMBER
`
`ART UNIT
`
`1727
`
`MAIL DATE
`
`02/13/2013
`
`DELIVERY MODE
`
`PAPER
`
`Please find below and/or attached an Office communication concerning this application or proceeding.
`
`The time period for reply, if any, is set in the attached communication.
`
`PTOL—90A (Rev. 04/07)
`
`

`

`
`
`Office Action Summary
`
`Application No.
`
`Applicant(s)
`
`
` 12/177,442 HERLE, P. SUBRAMANYA
`Examiner
`Art Unit
`MARIA J. LAIOS
`1727
`
`-- The MAILING DA TE of this communication appears on the cover sheet with the correspondence address --
`Period for Reply
`
`A SHORTENED STATUTORY PERIOD FOR REPLY IS SET TO EXPIRE 3 MONTH(S) OR THIRTY (30) DAYS,
`WHICHEVER IS LONGER, FROM THE MAILING DATE OF THIS COMMUNICATION.
`Extensions of time may be available under the provisions of 37 CFR 1.136(a).
`In no event however may a reply be timely filed
`after SIX () MONTHS from the mailing date of this communication.
`If NO period for reply is specified above, the maximum statutory period will apply and will expire SIX (6) MONTHS from the mailing date of this communication.
`-
`- Failure to reply within the set or extended period for reply will, by statute, cause the application to become ABANDONED (35 U.S.C. § 133).
`Any reply received by the Office later than three months after the mailing date of this communication, even if timely filed, may reduce any
`earned patent term adjustment. See 37 CFR 1.704(b).
`
`Status
`
`1)IZI Responsive to communication(s) filed on 02 October 2012.
`
`2a)IZI This action is FINAL.
`
`2b)|:l This action is non-final.
`
`3)I:I An election was made by the applicant in response to a restriction requirement set forth during the interview on
`
`
`; the restriction requirement and election have been incorporated into this action.
`
`4)|:l Since this application is in condition for allowance except for formal matters, prosecution as to the merits is
`
`closed in accordance with the practice under Exparte Quay/e, 1935 CD. 11, 453 O.G. 213.
`
`Disposition of Claims
`
`5)|Zl Claim(s) 1 68-17and 19-34 is/are pending in the application.
`
`5a) Of the above claim(s) _ is/are withdrawn from consideration.
`
`6)I:l Claim(s)_ is/are allowed.
`
`7)|Xl Claim(s) 1 68-17and 19-34 is/are rejected.
`
`8)I:l Claim(s)_ is/are objected to.
`
`
`9)I:I Claim((s)
`
`are subject to restriction and/or election requirement.
`
`* If any claims have been determined allowable, you may be eligible to benefit from the Patent Prosecution Highway
`program at a participating intellectual property office for the corresponding application. For more information, please see
`
`httn:,I/www usntq. quwua'ertslanr events/
`h/index.'s or send an inquiry to PPeredback us Emmi.
`
`Application Papers
`
`10)|:| The specification is objected to by the Examiner.
`
`11)|Xl The drawing(s) filed on 22 July 2008 is/are: a)IXI accepted or b)I:I objected to by the Examiner.
`
`Applicant may not request that any objection to the drawing(s) be held in abeyance. See 37 CFR 1.85(a).
`
`Replacement drawing sheet(s) including the correction is required if the drawing(s) is objected to. See 37 CFR 1.121 (d).
`
`Priority under 35 U.S.C. § 119
`
`12)|:| Acknowledgment is made of a claim for foreign priority under 35 U.S.C. § 119(a)-(d) or (f).
`
`a)|:| All
`
`b)|:l Some * c)I:I None of:
`
`1.I:I Certified copies of the priority documents have been received.
`
`2.|:l Certified copies of the priority documents have been received in Application No. _
`
`3.I:I Copies of the certified copies of the priority documents have been received in this National Stage
`
`application from the International Bureau (PCT Rule 17.2(a)).
`
`* See the attached detailed Office action for a list of the certified copies not received.
`
`
`
`Attachment(s)
`
`1) IZI Notice of References Cited (PTO-892)
`
`2) E Information Disclosure Statement(s) (PTO/SB/08)
`Paper No(s)/Mai| Date 20120712 20121220.
`US. Patent and Trademark Office
`
`3) I] Interview Summary (PTO-413)
`Paper No(s)/Mai| Date.
`4) D Other:
`
`PTOL-326 (Rev. 09-12)
`
`Office Action Summary
`
`Part of Paper No./Mai| Date 20130209
`
`

`

`Application/Control Number: 12/177,442
`
`Page 2
`
`Art Unit: 1727
`
`DETAILED ACTION
`
`1.
`
`This office action is in response to the amendment filed 10/2/2012. Claims 1, 6 and 17
`
`have been amended. Claims 2—5, 7 and 18 are cancelled. Claims 1, 6, 8—17 and 19—34 are
`
`currently pending.
`
`2.
`
`The text of those sections of Title 35, US. Code not included in this action can be found
`
`in a prior Office action.
`
`Claim Rejections - 35 USC § 103
`
`3.
`
`The previous rejections of 7/3/2012 are Withdrawn because the claims have been
`
`amended.
`
`4.
`
`Claims 1, 6, 8—17, 19—26, 28—34 are rejected under 35 USC. 103(a) as being unpatentable
`
`over SugnauX et al. (US 2004/0131934) in view of Kawakami et al. (US 2006/0127773 A1).
`
`As to claims 1, 6, 8-10, 14, 15, 16, 17, 19, 29 and 31, SugnauX et al. discloses a battery
`
`comprising a positive electrode; a negative electrode; an electrolyte (paragraphs 71—72). The
`
`electrolyte includes a lithium salt and a solvent (paragraph 87). The electrodes comprise an
`
`active material, a conductive material and a binder (paragraph 74, 80) on a current collector
`
`(figure 4).
`
`An electrochemical cell having an electrode active material with porosity and comprises
`
`nanoparticles and micro particles (paragraph 19). The electrode (50) comprises nanoparticles
`
`(41) in contact with microparticles (53), binder particles (42), and electrically conductive
`
`particles (55) all on a current collector (54). SugnauX et al. discloses the active material
`
`

`

`Application/Control Number: 12/177,442
`
`Page 3
`
`Art Unit: 1727
`
`comprises oxides of selected from the group consisting of Group IB, IIA, IIB, IIIA, IVA, IVB,
`
`VA, VB, VITB, VIIB and VIII elements of the Periodic Table of Elements, and blends thereof
`
`(paragraph 49) and specifically teaches titanium dioxide (paragraph 87—applies to claims 15, 16,
`
`29). However Sugnaux does not disclose nanoparticles of tin, aluminum, or silicon.
`
`Kawakami et al. discloses a secondary battery and teaches an electrode having an active
`
`material (105), support material (104—titainium dioxide —paragraph 18), binder (103), conductive
`
`material (102) (paragraph 49). The active material comprises particles of silicon or tin powder
`
`having a size of 20 nm (paragraph 62, applies to claims 8 and 9) which is a lithium absorbing
`
`nano—material (applies to claim 14, 19, 31). The tin or silicon particles are amorphous (paragraph
`
`62—applies to claim 10) It would have been obvious to one of ordinary skill in the art at the time
`
`of the invention to include the silicon or tin of Kawakami et al. because this would provide an
`
`electrode with a long service lifetime and has a high capacity and a high energy density
`
`(paragraph 13—14).
`
`As to claim 11, Kawakami et al. teaches the conductive material can be an amorphous
`
`carbon (paragraph 73).
`
`As to claims 12 and 26, Sugnaux discloses electrodes employed have a mesoporous
`
`framework structure (paragraph 68).
`
`As to claims 13 and 28, Sugnaux discloses the active material which includes the
`
`conductive material having a conductive material of carbon nanotubes (paragraph 53).
`
`As to claims 20-25, Sugnaux et al. further discloses the porous electrode can be used as
`
`the anode or the cathode (Paragraph 87—applies to claim 20, 23). Modified Sugnaux et al.
`
`teaches the particles of silicon or tin powder having a size of 20 nm (paragraph 62).
`
`

`

`Application/Control Number: 12/177,442
`
`Page 4
`
`Art Unit: 1727
`
`As to claim 30, the electrodes are separated by a separator (3, figure 4).
`
`As to claims 32-34, modified SugnauX discloses the electrode having an active material
`
`with nanoparticles. the product—by—limitations of claims 33—34 are not given patentable weight
`
`since the courts have held that patentability is based on a product itself, even if the prior art
`
`product is made by a different process (In re Thorpe, 227 USPQ 964, 1985). Moreover, a
`
`product—by—process limitation is held to be obvious if the product is similar to a prior art product
`
`(In re Brown, 173 USPQ 685, and In re Fessman, 180 USPQ 324). Claims 33—34 as written does
`
`not distinguish the product of the instant application from the product of the prior art.
`
`5.
`
`Claim 27 is rejected under 35 U.S.C. 103(a) as being unpatentable over SugnauX et al.
`
`(US 2004/0131934) in view of Kawakami et al. (US 2006/0127773 A1) as applied to claim 17
`
`above, and further in view of SugnauX (EP 1 207 572 A1).
`
`As to claim 27, modified SugnauX et al. discloses the frame work of the electrode to have
`
`a mesoporous structure but not a macro porous structure. SugnauX (572) teaches mesopores and
`
`macropores (45 and 46) linked to inter—particular electrolyte channels (50). Linking means
`
`between the particles are assured by the binder and conductive particles (48) that provide an
`
`interconnecting network with micro particles. The percolating electron conduction network
`
`occupies a small domain only at the external surfaces of the particles leaving the pores accessible
`
`to the electrolyte (Paragraph 40). Since the network includes the mesopores the network is
`
`mesoporous network and since the network also includes macropores the porous network is also
`
`a macroporous network (applies to claim 27). It would have been obvious to one of ordinary
`
`

`

`Application/Control Number: 12/177,442
`
`Page 5
`
`Art Unit: 1727
`
`skill in the art at the time of the invention to include macropores because this would provide an
`
`efficient ion conduction network for the electrolyte.
`
`Response to Arguments
`
`6.
`
`Applicant’s arguments with respect to claims 1, 6, 17 have been considered but are moot
`
`because the rejection has changed since the claims have been amended.
`
`Conclusion
`
`7.
`
`Applicant's amendment necessitated the new ground(s) of rejection presented in this
`
`Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a).
`
`Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a).
`
`A shortened statutory period for reply to this final action is set to expire THREE
`
`MONTHS from the mailing date of this action. In the event a first reply is filed within TWO
`
`MONTHS of the mailing date of this final action and the advisory action is not mailed until after
`
`the end of the THREE—MONTH shortened statutory period, then the shortened statutory period
`
`will expire on the date the advisory action is mailed, and any extension fee pursuant to 37
`
`CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event,
`
`however, will the statutory period for reply expire later than SIX MONTHS from the date of this
`
`final action.
`
`Any inquiry concerning this communication or earlier communications from the
`
`examiner should be directed to MARIA J. LAIOS whose telephone number is (571)272—9808.
`
`The examiner can normally be reached on 11am—7pm Monday—Thursday.
`
`

`

`Application/Control Number: 12/177,442
`
`Page 6
`
`Art Unit: 1727
`
`If attempts to reach the examiner by telephone are unsuccessful, the examiner’s
`
`supervisor, Barbara Gilliam can be reached on 571—272—1330. The fax phone number for the
`
`organization Where this application or proceeding is assigned is 571—273—8300.
`
`Information regarding the status of an application may be obtained from the Patent
`
`Application Information Retrieval (PAIR) system. Status information for published applications
`
`may be obtained from either Private PAIR or Public PAIR. Status information for unpublished
`
`applications is available through Private PAIR only. For more information about the PAIR
`
`system, see http://pair—direct.uspto.gov. Should you have questions on access to the Private PAIR
`
`system, contact the Electronic Business Center (EBC) at 866—217—9197 (toll—free). If you would
`
`like assistance from a USPTO Customer Service Representative or access to the automated
`
`information system, call 800—786—9199 (IN USA OR CANADA) or 571—272—1000.
`
`/MARIA J LAIOS/
`
`Primary Examiner, Art Unit 1727
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket