throbber

`“x
`‘\\f
`
`
`
`UNITED STATES PATENT AND TRADEMARK OFFICE
`
`UNITED STATES DEPARTMENT OF COMMERCE
`United States Patent and Trademark Office
`Address: COMIVHSSIONER FOR PATENTS
`PO. Box 1450
`Alexandria1 Virginia 22313-1450
`www.uspto.gov
`
`
`
`
`
`15/023,386
`
`03/20/2016
`
`KENTARO KURODA
`
`PIPMB—56 168
`
`3147
`
`”90
`52054
`1801 EAST 9TH STREET
`S UITE 1 200
`
`05’04’20” —
`MALIK’ RAHEENA REHMAN
`
`3744
`
`NOTIFICATION DATE
`
`DELIVERY MODE
`
`05/04/2017
`
`ELECTRONIC
`
`Please find below and/or attached an Office communication concerning this application or proceeding.
`
`The time period for reply, if any, is set in the attached communication.
`
`Notice of the Office communication was sent electronically on above—indicated "Notification Date" to the
`following e—mail address(es):
`
`patdocket @ pearne.c0m
`
`PTOL—90A (Rev. 04/07)
`
`

`

`
`
`Applicant(s)
`Application No.
` 15/023,386 KU RODA ET AL.
`
`
`AIA (First Inventor to File)
`Art Unit
`Examiner
`Office Action Summary
`
`
`RAHEENA R. MALIK $2215 3744
`-- The MAILING DA TE of this communication appears on the cover sheet with the correspondence address --
`Period for Reply
`
`A SHORTENED STATUTORY PERIOD FOR REPLY IS SET TO EXPIRE g MONTHS FROM THE MAILING DATE OF
`THIS COMMUNICATION.
`Extensions of time may be available under the provisions of 37 CFR1. 136( a).
`after SIX () MONTHS from the mailing date of this communication.
`If NO period for reply is specified above, the maximum statutory period will apply and will expire SIX (6) MONTHS from the mailing date of this communication.
`-
`- Failure to reply within the set or extended period for reply will, by statute, cause the application to become ABANDONED (35 U.S.C. § 133).
`Any reply received by the Office later than three months after the mailing date of this communication, even if timely filed, may reduce any
`earned patent term adjustment. See 37 CFR 1 .704(b).
`
`In no event, however, may a reply be timely filed
`
`Status
`
`1)IZI Responsive to communication(s) filed on 03/20/2016.
`El A declaration(s)/affidavit(s) under 37 CFR 1.130(b) was/were filed on
`
`2b)|ZI This action is non-final.
`2a)|:l This action is FINAL.
`3)I:I An election was made by the applicant in response to a restriction requirement set forth during the interview on
`
`; the restriction requirement and election have been incorporated into this action.
`
`4)|:| Since this application is in condition for allowance except for formal matters, prosecution as to the merits is
`
`closed in accordance with the practice under Exparte Quay/e, 1935 CD. 11, 453 O.G. 213.
`
`Disposition of Claims*
`
`5)IZI Claim(s) 1-10 is/are pending in the application.
`5a) Of the above claim(s)
`is/are withdrawn from consideration.
`
`is/are allowed.
`6)I:I Claim(s)
`7)|Z| Claim(s)_1-10 is/are rejected.
`8)|:I Claim(s)_ is/are objected to.
`
`
`are subject to restriction and/or election requirement.
`9)I:I Claim((s)
`* If any claims have been determined allowable, you may be eligible to benefit from the Patent Prosecution Highway program at a
`
`participating intellectual property office for the corresponding application. For more information, please see
`hit
`I/'/\WIIW.USOI.O. ovI’ atentS/init events/
`
`
`
`iindex.‘s or send an inquiry to PPI-iieedback{®usgtc.00v.
`
`Application Papers
`
`10)I:l The specification is objected to by the Examiner.
`11)|Xl The drawing(s) filed on 03/20/2016 is/are: a)IXI accepted or b)|:l objected to by the Examiner.
`Applicant may not request that any objection to the drawing(s) be held in abeyance. See 37 CFR 1.85(a).
`
`Replacement drawing sheet(s) including the correction is required if the drawing(s) is objected to. See 37 CFR 1.121 (d).
`
`Priority under 35 U.S.C. § 119
`
`12)IXI Acknowledgment is made of a claim for foreign priority under 35 U.S.C. § 119(a)-(d) or (f).
`Certified copies:
`
`a)IZl All
`
`b)|:l Some” c)I:l None of the:
`
`1.IXI Certified copies of the priority documents have been received.
`2.|:l Certified copies of the priority documents have been received in Application No.
`SIXI Copies of the certified copies of the priority documents have been received in this National Stage
`
`application from the International Bureau (PCT Rule 17.2(a)).
`** See the attached detailed Office action for a list of the certified copies not received.
`
`Attachment(s)
`
`
`
`3) D Interview Summary (PTO-413)
`1) E Notice of References Cited (PTO-892)
`Paper No(s)/Mai| Date.
`.
`.
`4) I:I Other'
`2) E InformatIon DIsclosure Statement(s) (PTO/SB/08a and/or PTO/SB/08b)
`Paper No(s)/Mai| Date
`US. Patent and Trademark Office
`PTOL—326 (Rev. 11-13)
`
`Office Action Summary
`
`Part of Paper No./Mai| Date 20170427
`
`

`

`Application/Control Number: 15/023,386
`
`Art Unit: 3744
`
`Page 2
`
`DETAILED ACTION
`
`Notice of Pre-AIA or AIA Status
`
`1.
`
`The present application, filed on or after March 16, 2013, is being examined under the first
`
`inventor to file provisions of the AIA.
`
`2.
`
`The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for
`
`Claim Rejections - 35 USC § 102
`
`the rejections under this section made in this Office action:
`
`A person shall be entitled to a patent unless —
`
`(a)(1) the claimed invention was patented, described in a printed publication, or in public use,
`on sale or otherwise available to the public before the effective filing date of the claimed
`invention.
`
`3.
`
`Claims 1-10 are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Meyer et al. (US
`
`6,862,892, herein Meyer).
`
`In regards to claim 1, Meyer discloses
`
`An air conditioning device for a vehicle (Fig.2), comprising:
`
`a first water-refrigerant heat exchanger (67) that exchanges heat between a refrigerant of low-
`
`temperature and low-pressure in a heat pump and an engine coolant flowing in an engine coolant path
`
`(62) to vaporize the refrigerant;
`
`a second water-refrigerant heat exchanger (70) that exchanges heat between the refrigerant of
`
`high-temperature and high-pressure in the heat pump and the engine coolant to condense the refrigerant;
`
`and
`
`a first flow rate adjusting unit (Fig.1, 46) that is capable of adjusting a flow rate of the engine
`
`coolant supplied to a flow path connecting with the first water-refrigerant heat exchanger, and a flow rate
`
`of the engine coolant supplied to a flow path bypassing the first water-refrigerant heat exchanger (col.6
`
`lines 3-8).
`
`In regards to claim 2, Meyer discloses a control unit that controls the first flow rate adjusting unit (col.6
`
`lines 3-8), wherein the control unit switches the first flow rate adjusting unit to a state where the engine
`
`

`

`Application/Control Number: 15/023,386
`
`Art Unit: 3744
`
`Page 3
`
`coolant is supplied to a route bypassing the first water-refrigerant heat exchanger (at point 27) when a
`
`pressure of the refrigerant of high-temperature and high-pressure discharged from a compressor for
`
`compressing and discharging the refrigerant is a predetermined pressure or higher in a heat pump
`
`heating mode where the refrigerant of the heat pump is supplied to both the first water-refrigerant heat
`
`exchanger and the second water-refrigerant heat exchanger (Fig.2).
`
`In regards to claim 3, Meyer discloses that the control unit switches the first flow rate adjusting unit to a
`
`state where a part of the engine coolant is supplied to the route bypassing the first water-refrigerant heat
`
`exchanger (through point 27).
`
`In regards to claim 4, Meyer discloses that the control unit allows the first flow rate adjusting unit to
`
`increase a flow rate of the engine coolant flowing along the route bypassing the first water-refrigerant heat
`
`exchanger in accordance with a rise in the pressure of the refrigerant of high-temperature and high-
`
`pressure when the pressure of the refrigerant of high-temperature and high-pressure refrigerant
`
`discharged from the compressor is the predetermined pressure or higher (col.6 lines 3-8).
`
`In regards to claim 5, Meyer discloses a control unit that controls the first flow rate adjusting unit (col.6
`
`lines 3-8), wherein the control unit switches the first flow rate adjusting unit to a state where the engine
`
`coolant is supplied to a route bypassing the first water-refrigerant heat exchanger (at point 27) when a
`
`temperature of the engine coolant passing through the second water-refrigerant heat exchanger is a
`
`predetermined temperature or higher in a heat pump heating mode where the refrigerant of the heat
`
`pump is supplied to both the first water-refrigerant heat exchanger and the second water-refrigerant heat
`
`exchanger (Fig.2).
`
`In regards to claim 6, Meyer discloses that the control unit switches the first flow rate adjusting unit to a
`
`state where a part of the engine coolant is supplied to the route bypassing the first water-refrigerant heat
`
`exchanger (through point 27).
`
`In regards to claim 7, Meyer discloses that the control unit allows the first flow rate adjusting unit to
`
`increase a flow rate of the engine coolant flowing along the route bypassing the first water-refrigerant heat
`
`exchanger in accordance with a rise in the temperature of the engine coolant when the temperature of the
`
`

`

`Application/Control Number: 15/023,386
`
`Art Unit: 3744
`
`Page 4
`
`engine coolant passing through the second water-refrigerant heat exchanger is the predetermined
`
`temperature or higher (col.6 lines 3-8).
`
`In regards to claim 8, Meyer discloses an evaporator (38) that exchanges heat between the refrigerant
`
`of low-temperature and low-pressure and intake air to be supplied to a vehicle interior; and
`
`a condenser (76) that receives a flow of the refrigerant of high-temperature and high-pressure,
`
`and releases heat from the refrigerant of high-temperature and high-pressure to outside air, wherein a
`
`refrigerant path extending from the second water-refrigerant heat exchanger to the first water-refrigerant
`
`heat exchanger is different from a refrigerant path extending from the condenser to the evaporator (Fig.2).
`
`In regards to claim 9, Meyer discloses a compressor (72) that compresses the refrigerant; and a check
`
`valve (80) disposed between the compressor and the evaporator in a refrigerant circuit.
`
`In regards to claim 10, Meyer discloses a first expansion unit that expands the refrigerant delivered from
`
`the second water-refrigerant heat exchanger, and delivers the expanded refrigerant to the first water-
`
`refrigerant heat exchanger (Abstract, second expansion device); and a second expansion unit that
`
`expands the refrigerant condensed by the condenser, and discharges the expanded refrigerant to the
`
`evaporator (Abstract, first expansion device).
`
`Conclusion
`
`4.
`
`The prior art made of record and not relied upon is considered pertinent to applicant's disclosure.
`
`US 6,640,889 disclose an air conditioning device for a vehicle.
`
`Any inquiry concerning this communication or earlier communications from the examiner should
`
`be directed to RAHEENA R. MALIK whose telephone number is (571)272-2994. The examiner can
`
`normally be reached on M-F 8:30-5:00.
`
`Examiner interviews are available via telephone, in-person, and video conferencing using a
`
`USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use
`
`the USPTO Automated lnterview Request (AIR) at http://www.uspto.gov/interviewpractice.
`
`

`

`Application/Control Number: 15/023,386
`
`Art Unit: 3744
`
`Page 5
`
`If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor,
`
`Jianying Atkisson can be reached on (571) 270-7740. The fax phone number for the organization where
`
`this application or proceeding is assigned is 571 -273-8300.
`
`Information regarding the status of an application may be obtained from the Patent Application
`
`Information Retrieval (PAIR) system. Status information for published applications may be obtained from
`
`either Private PAIR or Public PAIR. Status information for unpublished applications is available through
`
`Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should
`
`you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC)
`
`at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative
`
`or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571 -272-
`
`1000.
`
`/RAHEENA R MALIK/
`
`Examiner, Art Unit 3744
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket