throbber
www.uspto.gov
`
`UNITED STATES DEPARTMENT OF COMMERCE
`United States Patent and TrademarkOffice
`Address; COMMISSIONER FOR PATENTS
`P.O. Box 1450
`Alexandria, Virginia 22313-1450
`
`16/614,393
`
`11/18/2019
`
`TETSUYA YAMAMOTO
`
`731456.559USPC
`
`5206
`
`Seed IP Law Group LLP/Panasonic (PIPCA)
`701 5th Avenue, Suite 5400
`Seattle, WA 98104
`
`CHANG, YU-WEN
`
`PAPER NUMBER
`
`ART UNIT
`
`2413
`
`NOTIFICATION DATE
`
`DELIVERY MODE
`
`01/24/2022
`
`ELECTRONIC
`
`Please find below and/or attached an Office communication concerning this application or proceeding.
`
`The time period for reply, if any, is set in the attached communication.
`
`Notice of the Office communication was sent electronically on above-indicated "Notification Date" to the
`following e-mail address(es):
`USPTOeAction @ SeedIP.com
`
`pairlinkdktg @seedip.com
`
`PTOL-90A (Rev. 04/07)
`
`

`

`
`
`Disposition of Claims*
`21-40 is/are pending in the application.
`)
`Claim(s)
`5a) Of the above claim(s) ___ is/are withdrawn from consideration.
`C} Claim(s)
`is/are allowed.
`Claim(s) 21-40 is/are rejected.
`S)
`) © Claim(s)____is/are objected to.
`Cj) Claim(s
`are subjectto restriction and/or election requirement
`)
`S)
`* If any claims have been determined allowable, you maybeeligible to benefit from the Patent Prosecution Highway program at a
`participating intellectual property office for the corresponding application. For more information, please see
`http://www.uspto.gov/patents/init_events/pph/index.jsp or send an inquiry to PPHfeedback@uspto.gov.
`
`) )
`
`Application Papers
`10) The specification is objected to by the Examiner.
`11)0) The drawing(s) filedon__ is/are: a)(J accepted or b)() objected to by the Examiner.
`Applicant may not request that any objection to the drawing(s) be held in abeyance. See 37 CFR 1.85(a).
`Replacement drawing sheet(s) including the correction is required if the drawing(s) is objected to. See 37 CFR 1.121 (d).
`
`Priority under 35 U.S.C. § 119
`12)1) Acknowledgment is made of a claim for foreign priority under 35 U.S.C. § 119(a)-(d)or (f).
`Certified copies:
`c)Z None ofthe:
`b)() Some**
`a)C All
`1.2 Certified copies of the priority documents have been received.
`2.1.) Certified copies of the priority documents have been received in Application No.
`3.1.) Copies of the certified copies of the priority documents have been receivedin this National Stage
`application from the International Bureau (PCT Rule 17.2(a)).
`* See the attached detailed Office action for a list of the certified copies not received.
`
`Attachment(s)
`
`1)
`
`Notice of References Cited (PTO-892)
`
`2) (J Information Disclosure Statement(s) (PTO/SB/08a and/or PTO/SB/08b)
`Paper No(s)/Mail Date
`U.S. Patent and Trademark Office
`
`3) (J Interview Summary (PTO-413)
`Paper No(s)/Mail Date
`(Qj Other:
`
`4)
`
`PTOL-326 (Rev. 11-13)
`
`Office Action Summary
`
`Part of Paper No./Mail Date 20211213
`
`Application No.
`Applicant(s)
`16/614,393
`YAMAMOTOetal.
`
`Office Action Summary Art Unit|AIA (FITF) StatusExaminer
`YU-WEN CHANG
`2413
`Yes
`
`
`
`-- The MAILING DATEofthis communication appears on the cover sheet with the correspondence address --
`Period for Reply
`
`A SHORTENED STATUTORY PERIOD FOR REPLYIS SET TO EXPIRE 3 MONTHS FROM THE MAILING
`DATE OF THIS COMMUNICATION.
`Extensions of time may be available underthe provisions of 37 CFR 1.136(a). In no event, however, may a reply betimely filed after SIX (6) MONTHSfrom the mailing
`date of this communication.
`If NO period for reply is specified above, the maximum statutory period will apply and will expire SIX (6) MONTHSfrom the mailing date of this communication.
`-
`- Failure to reply within the set or extended period for reply will, by statute, cause the application to become ABANDONED (35 U.S.C. § 133}.
`Any reply received by the Office later than three months after the mailing date of this communication, evenif timely filed, may reduce any earned patent term
`adjustment. See 37 CFR 1.704(b).
`
`Status
`
`1) Responsive to communication(s) filed on 14 October 2021.
`C) A declaration(s)/affidavit(s) under 37 CFR 1.130(b) was/werefiled on
`
`2a)L) This action is FINAL. 2b)¥)This action is non-final.
`3)02 An election was madeby the applicant in responseto a restriction requirement set forth during the interview
`on
`; the restriction requirement and election have been incorporated into this action.
`4\0) Since this application is in condition for allowance except for formal matters, prosecution as to the merits is
`closed in accordance with the practice under Exparte Quayle, 1935 C.D. 11, 453 O.G. 213.
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 2
`
`DETAILED ACTION
`
`Notice of Pre-AlA or AIA Status
`
`1.
`
`The present application, filed on or after March 16, 2013, is being examined
`
`under the first inventor to file provisions of the AIA.
`
`Continued Examination Under 37 CFR 1.114
`
`2.
`
`A requestfor continued examination under 37 CFR 1.114, including the fee set
`
`forth in 37 CFR 1.17(e), wasfiled in this application after final rejection. Since this
`
`application is eligible for continued examination under 37 CFR 1.114, and the fee set
`
`forth in 37 CFR 1.17(e) has been timely paid, the finality of the previous Office action
`
`has been withdrawn pursuant to 37 CFR 1.114. Applicant's submission filed on
`
`10/14/2021 has been entered.
`
`Responseto Arguments
`
`3.
`
`Applicant's arguments with respect to claims have been considered but are moot
`
`in view of new grounds of rejection.
`
`Claim Rejections - 35 USC § 103
`
`4.
`
`In the event the determination of the status of the application as subject to AIA 35
`
`U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103)is incorrect, any
`
`correction of the statutory basis for the rejection will not be considered a new ground of
`
`rejection if the prior art relied upon, and the rationale supporting the rejection, would be
`
`the same under either status.
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 3
`
`The following is a quotation of 35 U.S.C. 103 which forms the basis for all
`
`obviousnessrejections setforth in this Office action:
`
`A patent for a claimed invention may not be obtained, notwithstanding that the claimed
`invention is not identically disclosed as set forth in section 102, if the differences between the
`claimed invention and the prior art are such that the claimed invention as a whole would have
`been obvious before the effective filing date of the claimed invention to a person having
`ordinary skill in the art to which the claimed invention pertains. Patentability shall not be
`negated by the manner in which the invention was made.
`
`This application currently names joint inventors. In considering patentability of the
`
`claims the examiner presumes that the subject matter of the various claims was
`
`commonly ownedasof the effective filing date of the claimed invention(s) absent any
`
`evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to
`
`point out the inventor and effective filing dates of each claim that was not commonly
`
`ownedas ofthe effectivefiling date of the later invention in order for the examiner to
`
`consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2)
`
`prior art against the later invention.
`
`Claims 21-22, 24-29, 31-32 and 34-39 are rejected under 35 U.S.C. 103 as being
`
`unpatentable over Papasakellariou (US 2018/0310257, relying on the provisional
`
`application 62/490,835) in view of Park et al. (US 2019/0246416, relying on the
`
`provisional application 62/501 ,060) and Gaoet al. (US 2019/0174430).
`
`Regarding Claim 21, Papasakellariou teaches a terminal comprising: circuitry,
`
`which, in operation ([0029] FIG. 17 illustrates an example PUCCH structure for
`
`transmitting HARQ-ACK information or SR information), generates, based on sequence
`
`selection, uplink control information including at least one of HARQ-ACK (hybrid
`
`automatic repeat request acknowledgement and negative acknowledgment) for
`
`downlink data ([0086] UCI includes hybrid automatic repeat request acknowledgement
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 4
`
`(HARQ-ACK)information; [0252] a PUCCH structure for conveying HARQ-ACK with
`
`one bit or two bits uses CAZAC sequenceselection. When the UE has one HARQ-ACK
`
`bit to transmit and the UE is not configured to transmit SR, the UE can useafirst cyclic
`
`shift of a CAZAC sequence or a second cyclic shift of the CAZAC sequence to convey
`
`an ACK or a NACK,respectively. Similar, when the UE has two HARQ-ACK bits to
`
`transmit and the UE is not configured to transmit SR, the UE can useafirst, second,
`
`third, or fourth cyclic shift of a CAZAC sequence) or a scheduling request on the basis
`
`of a mode selected from amongaplurality of modes ([0253] A first design for
`
`multiplexing HARQ-ACK and a single SR bit in a same PUCCH is to use additional two
`
`or four cyclic shifts (referred to SR cyclic shifts), when the UE has one or two HARQ-
`
`ACK bits to transmit respectively, to transmit HARQ-ACK when the UE also has a
`
`positive SR to transmit; otherwise, when the UE has a negative SR to transmit, the UE
`
`uses the two or four cyclic shifts associated with the HARQ-ACK transmission (referred
`
`to as HARQ-ACKcyclic shifts)); and
`
`a transmitter, which, in operation ([0085] A UE transmits data information or UCI
`
`through a respective physical UL shared channel (PUSCH) or a physical UL control
`
`channel (PUCCH)), transmits the uplink control information using a physical uplink
`
`control channel (PUCCH) of one symbol ([0227] operation in high carrier frequencies,
`
`such asin millimeter wave bands, can be associated with large transmission BWs and
`
`PUCCH transmissions over a large BW andin only one symbol of a slot; [0245] A
`
`PUCCH transmission can be over one symbol or over multiple symbols with or without
`
`frequency hopping; [0273] the gNB can configure the UE with a SCS of 15 KHz, a
`
`PUCCH resource that spans 1 slot symbol in time),
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 5
`
`wherein a sequencefor the uplink control information including the HARQ-ACK ([0252]
`
`When the UE has one HARQ-ACK bit to transmit and the UE is not configured to
`
`transmit SR, the UE can usea first cyclic shift of a CAZAC sequence or a second cyclic
`
`shift of the CAZAC sequence to convey an ACK or a NACK,respectively. Similar, when
`
`the UE has two HARQ-ACK bits to transmit and the UE is not configured to transmit SR,
`
`the UE can useafirst, second, third, or fourth cyclic shift of a CAZAC sequence) is
`
`different from a sequencefor the uplink control information including both the HARQ-
`
`ACK and a scheduling request ([0253] A first design for multiplexing HARQ-ACK and a
`
`single SR bit in a same PUCCH is to use additional two or four cyclic shifts (referred to
`
`SR cyclic shifts), when the UE has one or two HARQ-ACK bits to transmit respectively,
`
`to transmit HARQ-ACKwhen the UE also has a positive SR to transmit; otherwise,
`
`when the UE has a negative SR to transmit, the UE uses the two or four cyclic shifts
`
`associated with the HARQ-ACK transmission (referred to as HARQ-ACK cyclic shifts)).
`
`However, Papasakellariou does not teach a mode selected in accordance with
`
`an operating environment of the terminal; a transmission power of the uplink control
`
`information does not depend on whether the uplink control information includes the
`
`scheduling request or not.
`
`In an analogous art, Park teaches a modeselected in accordance with an
`
`operating environmentof the terminal ([(0134] One or more transmission structures are
`
`available for the short PUCCH. For example, when the amountof UCI to be transmitted
`
`on the short PUCCH is small (e.g., 1 or 2 bits), the eNB mayallocate a setof a plurality
`
`of sequences as a short PUCCH resourceto the UE. The UE maythen select a specific
`
`sequence corresponding to the UCI to be transmitted from among the sequences
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 6
`
`allocated as the short PUCCH resource, and transmit the selected sequence. The
`
`sequences may be designedto satisfy a low peak power-to-average power ratio
`
`(PAPR) property; [0197] Even though the SR transmission resource overlaps with the
`
`UCI (e.g., ACK/NACK or CSI) on the time axis, unless the sum of transmission power
`
`allocated to each transmission resource exceeds the maximum transmission power of
`
`the UE (i.e., ina case other than a powerlimited case), the UE may transmit the SR
`
`and the UCI in their respective transmission resources; [0198] If the SR transmission
`
`resource overlaps with the UCI (e.g., ACK/NACK or CSI) transmission resource on the
`
`time axis, and this case correspondsto the power limited case, the UE may transmit
`
`the SR and the UCI in combination in the UCI transmission resource).
`
`Therefore, it would have been obvious to one of ordinary skill in the art before the
`
`effective filing date of the claimed invention to have combined Park’s method with
`
`Papasakellariou’s method so that a higher output power of a power amplifier can be
`
`generated, and therefore provides a wider coverage area. Thus, better services can be
`
`providedto a cell edge user with limited coverage, and uplink reference signal
`
`transmission reliability is improved.
`
`The combination of Papasakellariou and Park does not teach a transmission
`
`power of the uplink control information does not depend on whether the uplink control
`
`information includes the scheduling requestor not.
`
`In an analogous art, Gao teach a transmission power of the uplink control
`
`information does not depend on whether the uplink control information includes the
`
`scheduling requestor not ([0168] the target transmission power of the sPUCCH may be
`
`determined to be Pspuccu-1 by using formulas (2-1) and (2-2) ...
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 7
`
`Pspuccu(i) = min{Pemax, c (i), Po_ spuccn + PLe + 10l0g10(Mseuccuc(i)) + Atrc(i) + Arspuccn(F) + g(t}
`
`(2-2)
`
`(i.e., the formula does not scheduling request information)).
`
`Therefore, it would have been obvious to one of ordinary skill in the art before the
`
`effectivefiling date of the claimed invention to have combined Gao’s method with
`
`Papasakellariou’s method sothat the efficiency of the power amplifier can be improved
`
`with a lower peak-to-average-power-ratio. Thus, uplink reference signal transmission
`
`reliability and the system performance can be improved.
`
`Regarding Claim 22, the combination of Papasakellariou, Park and Gao,
`
`specifically Papasakellariou teaches the number of bits of the HARQ-ACK is 1 or 2
`
`([(0252] a PUCCH structure for conveying HARQ-ACK with one bit or two bits uses
`
`CAZAC sequenceselection).
`
`Regarding Claim 24, the combination of Papasakellariou, Park and Gao,
`
`specifically Papasakellariou teaches the sequence is a sequenceincluding a cyclic shift
`
`or a sequencedefined by a cyclic shift ([(0252] When the UE has one HARQ-ACK bit to
`
`transmit and the UE is not configured to transmit SR, the UE can usea first cyclic shift
`
`of a CAZAC sequenceor a secondcyclic shift of the CAZAC sequence to convey an
`
`ACK or a NACK, respectively. Similar, when the UE has two HARQ-ACK bits to transmit
`
`and the UE is not configured to transmit SR, the UE can useafirst, second, third, or
`
`fourth cyclic shift of a CAZAC sequence; [0253] A first design for multiplexing HARQ-
`
`ACK and a single SR bit in a same PUCCH is to use additional two or four cyclic shifts).
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 8
`
`Regarding Claim 25, the combination of Papasakellariou, Park and Gao,
`
`specifically Papasakellariou teaches a sequencefor the uplink control information
`
`including ACK (acknowledgement) as the HARQ-ACK is different from a sequence for
`
`the uplink control information including NACK (negative acknowledgment) as the
`
`HARQ-ACK ([0252] When the UE has one HARQ-ACK bit to transmit and the UE is not
`
`configured to transmit SR, the UE can useafirst cyclic shift of a CAZAC sequence or
`
`a secondcyclic shift of the CAZAC sequence to convey an ACK or a NACK,
`
`respectively).
`
`Regarding Claim 26, the combination of Papasakellariou, Park and Gao,
`
`specifically Papasakellariou teaches a physical resource block where the uplink control
`
`information including both the HARQ-ACKand the scheduling requestis transmitted is
`
`same as a physical resource block where the uplink control information including the
`
`HARQ-ACK is transmitted ([0225] Nsymp¥4 symbols 1710 are usedfor transmitting
`
`HARQ-ACK information 1720 or RS 1730 in a RB. HARQ-ACK bits b 1740 modulate
`
`1750 a CAZAC sequence 1760 using binary phase shift keying (BPSK) or quaternary
`
`phase shift keying (QPSK) modulation. A modulated CAZAC sequenceis transmitted
`
`after performing an IFFT 1770. A RSis transmitted through an unmodulated CAZAC
`
`sequence. For SR transmission, b=-1. A UE can transmit both HARQ-ACK and SR ina
`
`same slot by selecting a resource configured for SR transmission and transmitting
`
`HARQ-ACK information).
`
`Regarding Claim 27, the combination of Papasakellariou, Park and Gao,
`
`specifically Papasakellariou teaches the number of sequences assigned to one terminal
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 9
`
`is 4 for the HARQ-ACK of 1 bit ([0252] When the UE has one HARQ-ACK bit to transmit
`
`and the UE is not configured to transmit SR, the UE can usea first cyclic shift of a
`
`CAZAC sequenceor a secondcyclic shift of the CAZAC sequence to convey an ACK
`
`or a NACK,respectively; [0253] A first design for multiplexing HARQ-ACK andasingle
`
`SR bit in a same PUCCH is to use additional two or four cyclic shifts (referred to SR
`
`cyclic shifts), wnen the UE has one or two HARQ-ACK bits to transmit respectively, to
`
`transmit HARQ-ACK when the UE also hasa positive SR to transmit (i.e., 4 sequences
`
`are: a first cyclic shift of a CAZAC sequence, a secondcyclic shift, additional two
`
`cyclic shifts)), and
`
`the number of sequences assigned to one terminalis 8 for the HARQ-ACK of2 bits
`
`([(0252] when the UE has two HARQ-ACK bits to transmit and the UE is not configured
`
`to transmit SR, the UE can useafirst, second, third, or fourth cyclic shift of a CAZAC
`
`sequence; [0253] A first design for multiplexing HARQ-ACK anda single SR bit ina
`
`same PUCCH is to use additional two or four cyclic shifts (referred to SR cyclic shifts),
`
`when the UE has one or two HARQ-ACK bits to transmit respectively, to transmit
`
`HARQ-ACK when the UE also hasa positive SR to transmit (i.e., 8 sequences are: a
`
`first, second, third, or fourth cyclic shift, additional four cyclic shifts)).
`
`Regarding Claim 28, the combination of Papasakellariou, Park and Gao,
`
`specifically Papasakellariou teaches wherein in transmission of both HARQ-ACK and a
`
`scheduling request, the uplink control information is generated using one mode out of: a
`
`mode using the sequencefor the uplink control information including both the HARQ-
`
`ACK and the scheduling request([0253] A first design for multiplexing HARQ-ACK and
`
`a single SR bit in a same PUCCH is to use additional two or four cyclic shifts (referred
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 10
`
`to SR cyclic shifts), wnen the UE has one or two HARQ-ACK bits to transmit
`
`respectively, to transmit HARQ-ACK when the UE also hasa positive SR to transmit);
`
`and a mode using both a sequencefor the uplink control information including the
`
`HARQ-ACK and a sequencefor the uplink control information including the scheduling
`
`request ([0238] The UE can also be configured whether to jointly or separately transmit
`
`SR and HARQ-ACK/CSI. Separate transmission can apply, for example, when SR and
`
`HARQ-ACK/CSI have different reception reliability requirements and particularly when
`
`SR hashigher reception reliability requirements than HARQ-ACK/CSI; [0265] The UE
`
`behavior whether to jointly or separately transmit SR and HARQ-ACK/CSI can be
`
`configured to the UE by the gNB or be determined by the UE based on a predetermined
`
`or configured required transmission power differential; [0266] FIG. 20 illustrates a flow
`
`chart of a method 2000 for determination by a UE whether to jointly or separately
`
`transmit SR and HARQ-ACK).
`
`Regarding Claim 29, the combination of Papasakellariou, Park and Gao,
`
`specifically Papasakellariou teachesa receiver, which, in operation, receives
`
`information related to a resource of the PUCCH, wherein the uplink control information
`
`is generated and transmitted based on the information ([0265] The UE behavior whether
`
`to jointly or separately transmit SR and HARQ-ACK/CSI can be configured to the UE by
`
`the gNB; [0255] When the SR cyclic shifts are in same frequency resources as the
`
`HARQ-ACK cyclic shifts, the SR cyclic shifts are different than the HARQ-ACK cyclic
`
`shifts and all are cyclic shifts of a same CAZAC sequence. When the SR cyclic shifts
`
`are in different frequency resources than the HARQ-ACK cyclic shifts, the SR cyclic
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 11
`
`shifts can be same or different than the HARQ-ACK cyclic shifts and can be cyclic shifts
`
`of a same or different CAZAC sequence).
`
`Regarding Claim 31, the claim is interpreted and rejected for the same reason as
`
`set forth in Claim 21.
`
`Regarding Claim 32, the claim is interpreted and rejected for the same reason as
`
`set forth in Claim 22.
`
`Regarding Claim 34, the claim is interpreted and rejected for the same reason as
`
`set forth in Claim 24.
`
`Regarding Claim 35, the claim is interpreted and rejected for the same reason as
`
`set forth in Claim 25.
`
`Regarding Claim 36, the claim is interpreted and rejected for the same reason as
`
`set forth in Claim 26.
`
`Regarding Claim 37, the claim is interpreted and rejected for the same reason as
`
`set forth in Claim 27.
`
`Regarding Claim 38, the claim is interpreted and rejected for the same reason as
`
`set forth in Claim 28.
`
`Regarding Claim 39, the claim is interpreted and rejected for the same reason as
`
`set forth in Claim 29.
`
`Claims 23, 30, 33 and 40 are rejected under 35 U.S.C. 103 as being
`
`unpatentable over Papasakellariou in view of Park et al., Gao et al. and Nayeb Nazaret
`
`al. (US 2020/0067680, relying on the provisional application 62/500,772).
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 12
`
`Regarding Claim 23, the combination of Papasakellariou, Park and Gao does not
`
`teach the number of terminals multiplexed in the same physical resource blockis up to
`
`6 for the HARQ-ACK of1 bit.
`
`In an analogous art, Nayeb Nazar teaches the number of terminals multiplexed in
`
`the same physical resource blockis up to 6 for the HARQ-ACK of1 bit ([0093] If 12
`
`cyclic shifts are available within a PRB, up to six users may be supported in a PUCCH
`
`(e.g., short PUCCH) spanning 1 PRB).
`
`Therefore, it would have been obvious to one of ordinary skill in the art before the
`
`effective filing date of the claimed invention to have combined Nayeb Nazar’s method
`
`with Papasakellariou’s method so that the error rate for ACK/NACK detection can be
`
`improved with the spacing of the cyclic shift of a UE (Nayeb Nazar [0091]). Moreover, a
`
`maximum possible number of UEs can be multiplexed for PUCCH transmission. Thus,
`
`the system capacity is increased.
`
`Regarding Claim 30, the combination of Papasakellariou, Park and Gao does not
`
`teach the information includes information related to a cyclic shift used in the sequence.
`
`In an analogous art, Nayeb Nazar teaches the information includes information
`
`related to a cyclic shift used in the sequence ([(0099] The WTRU mayderive the
`
`resources (e.g., cyclic time shifts of a sequence) over which it may transmit ACK/NACK
`
`and/or SR from a received PUCCH parameter (e.g., a Short PUCCH index such as
`
`npuccH®"°"), The PUCCH parameter may be received from a higherlayer (e.g., from a
`
`network entity) or as part of downlink control information (e.g., in the NR-PDCCH). This
`
`resource index mayindicate at least one of (e.g., both of) a PUCCH region across the
`
`bandwidth or the cyclic shifts that may be allocated to the WTRU for UL signaling).
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 13
`
`Therefore, it would have been obvious to one of ordinary skill in the art before the
`
`effective filing date of the claimed invention to have combined Nayeb Nazar’s method
`
`with Papasakellariou’s method so that a better coordinated resource allocation
`
`mechanism can be achieved among different UEs. Moreover, the error rate for
`
`ACK/NACK detection can be improved with the spacing of the cyclic shift of a UE
`
`(Nayeb Nazar [0091)).
`
`Regarding Claim 33, the claim is interpreted and rejected for the same reason as
`
`set forth in Claim 23.
`
`Regarding Claim 40, the claim is interpreted and rejected for the same reason as
`
`set forth in Claim 30.
`
`Conclusion
`
`The prior art made of record and not relied upon is considered pertinent to
`
`applicant's disclosure.
`
`Wikstrom et al. (US 2018/0176909) teaches method of adaptive TTI length and
`
`sequence selection for low PAPR.
`
`Patel et al. (US 2018/0332624) teaches scheduling request techniques in
`
`wireless transmission.
`
`Any inquiry concerning this communication or earlier communications from the
`
`examiner should be directed to YU-WEN CHANG whosetelephone number is
`
`(408)918-7645. The examiner can normally be reached M-F 8:00am-5:00pm PT.
`
`Examiner interviews are available via telephone, in-person, and video
`
`conferencing using a USPTO supplied web-basedcollaboration tool. To schedule an
`
`

`

`Application/Control Number: 16/614,393
`Art Unit: 2413
`
`Page 14
`
`interview, applicant is encouraged to use the USPTO Automated Interview Request
`
`(AIR) at http:/Awww.uspto.gov/interviewpractice.
`
`If attempts to reach the examiner by telephone are unsuccessful, the examiner's
`
`supervisor, Un Cho can be reached on 571-272-7919. The fax phone number for the
`
`organization where this application or proceeding is assigned is 571-273-8300.
`
`Information regarding the status of published or unpublished applications may be
`
`obtained from Patent Center. Unpublished application information in Patent Center is
`
`available to registered users. To file and manage patent submissions in Patent Center,
`
`visit: https://patentcenter.uspto.gov. Visit https:/Awww.uspto.gov/patents/apply/patent-
`
`center for more information about Patent Center and
`
`https:/Awww.uspto.gov/patents/docx for information about filing in DOCX format. For
`
`additional questions, contact the Electronic Business Center (EBC) at 866-217-9197
`
`(toll-free). If you would like assistance from a USPTO Customer Service
`
`Representative, call 800-786-9199 (IN USA OR CANADA)or 571-272-1000.
`
`/YU-WEN CHANG/
`Examiner, Art Unit 2413
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket