throbber
www.uspto.gov
`
`UNITED STATES DEPARTMENT OF COMMERCE
`United States Patent and TrademarkOffice
`Address; COMMISSIONER FOR PATENTS
`P.O. Box 1450
`Alexandria, Virginia 22313-1450
`
`16/643,766
`
`03/02/2020
`
`TOMOHUMI TAKATA
`
`731456.563USPC
`
`1325
`
`Seed IP Law Group LLP/Panasonic (PIPCA)
`701 5th Avenue, Suite 5400
`Seattle, WA 98104
`
`NGUYEN, TU X
`
`PAPER NUMBER
`
`ART UNIT
`
`2642
`
`NOTIFICATION DATE
`
`DELIVERY MODE
`
`05/28/2021
`
`ELECTRONIC
`
`Please find below and/or attached an Office communication concerning this application or proceeding.
`
`The time period for reply, if any, is set in the attached communication.
`
`Notice of the Office communication was sent electronically on above-indicated "Notification Date" to the
`following e-mail address(es):
`USPTOeAction @ SeedIP.com
`
`pairlinkdktg @seedip.com
`
`PTOL-90A (Rev. 04/07)
`
`

`

`Office Action Summary
`
`Application No.
`16/643,766
`Examiner
`TU X NGUYEN
`
`Applicant(s)
`TAKATAetal.
`Art Unit
`2642
`
`AIA (FITF) Status
`Yes
`
`-- The MAILING DATEofthis communication appears on the cover sheet with the correspondence address --
`Period for Reply
`
`A SHORTENED STATUTORY PERIOD FOR REPLYIS SET TO EXPIRE 3 MONTHS FROM THE MAILING
`DATE OF THIS COMMUNICATION.
`Extensions of time may be available underthe provisions of 37 CFR 1.136(a). In no event, however, may a reply betimely filed after SIX (6) MONTHSfrom the mailing
`date of this communication.
`If NO period for reply is specified above, the maximum statutory period will apply and will expire SIX (6) MONTHSfrom the mailing date of this communication.
`-
`- Failure to reply within the set or extended period for reply will, by statute, cause the application to become ABANDONED (35 U.S.C. § 133}.
`Any reply received by the Office later than three months after the mailing date of this communication, evenif timely filed, may reduce any earned patent term
`adjustment. See 37 CFR 1.704(b).
`
`Status
`
`
`
`1) Responsive to communication(s)filed on 13 May 2021.
`C) A declaration(s)/affidavit(s) under 37 CFR 1.130(b) was/werefiled on
`
`2a)L) This action is FINAL. 2b)¥)This action is non-final.
`3)02 An election was madeby the applicant in responseto a restriction requirement set forth during the interview
`on
`; the restriction requirement and election have been incorporated into this action.
`4\0) Since this application is in condition for allowance except for formal matters, prosecution as to the merits is
`closed in accordance with the practice under Exparte Quayle, 1935 C.D. 11, 453 O.G. 213.
`
`Disposition of Claims*
`1-11 and 13 is/are pending in the application.
`)
`Claim(s)
`5a) Of the above claim(s) ___ is/are withdrawn from consideration.
`(J Claim(s)__ is/are allowed.
`Claim(s) 1-4,6-11 and 13 is/are rejected.
`Claim(s) 5 is/are objectedto.
`1) Claim(s
`are subject to restriction and/or election requirement
`)
`* If any claims have been determined allowable, you maybeeligible to benefit from the Patent Prosecution Highway program at a
`participating intellectual property office for the corresponding application. For more information, please see
`http:/Awww.uspto.gov/patents/init_events/pph/index.jsp or send an inquiry to PPHfeedback@uspto.gov.
`
`) ) ) )
`
`Application Papers
`10)( The specification is objected to by the Examiner.
`11)M The drawing(s) filed on 02 March 2020 is/are: a)) accepted or b)() objected to by the Examiner.
`Applicant may not request that any objection to the drawing(s) be held in abeyance. See 37 CFR 1.85(a).
`Replacement drawing sheet(s) including the correction is required if the drawing(s) is objected to. See 37 CFR 1.121 (d).
`
`Priority under 35 U.S.C. § 119
`12)[¥] Acknowledgment is made of a claim for foreign priority under 35 U.S.C. § 119(a)-(d)or (f).
`Certified copies:
`c)() None ofthe:
`b)( Some**
`a) All
`1.4) Certified copies of the priority documents have been received.
`2.1) Certified copies of the priority documents have beenreceived in Application No.
`3.1.) Copies of the certified copies of the priority documents have been received in this National Stage
`application from the International Bureau (PCT Rule 17.2(a)).
`* See the attached detailed Office action for a list of the certified copies not received.
`
`Attachment(s)
`
`1)
`
`Notice of References Cited (PTO-892)
`
`Information Disclosure Statement(s) (PTO/SB/08a and/or PTO/SB/08b)
`2)
`Paper No(s)/Mail Date
`U.S. Patent and Trademark Office
`
`3) (J Interview Summary (PTO-413)
`Paper No(s)/Mail Date
`(Qj Other:
`
`4)
`
`PTOL-326 (Rev. 11-13)
`
`Office Action Summary
`
`Part of Paper No./Mail Date 20210521
`
`

`

`Application/Control Number: 16/643,766
`Art Unit: 2642
`
`Page 2
`
`DETAILED ACTION
`
`Claim Rejections - 35 USC § 102
`
`The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that
`
`form the basis for the rejections under this section made in this Office action:
`
`A person shall be entitled to a patent unless —
`
`(a)(2) the claimed invention was described in a patentissued under section 151, orinan
`application for patent published or deemed published under s ection 122(b), in which the
`patentor application, as the case maybe, namesanotherinventor and waseffectively filed
`before the effective filing date of the claimed invention.
`
`Claims 1-4, 6-11 and 13 are rejected under 35 U.S.C. 102(a)(2) as being
`
`anticipated by Park (US Pub. 2019/0190747, Provisional Application 62501706).
`
`Regarding claims 1 and 13, Park discloses a terminal comprising:
`
`Circuitry (par.0484-0488, fig.14), which, in operation, calculates a transmission
`
`powerof an uplink signal (par.018 “the transmission power of the PUSCH.....calculated
`
`by the UE”) by using transmission power control information (par.018 “using a downlink
`
`reference signal indicated by the parameter set for the power control of the PUSCH’,
`
`
`
`par.021-22) indicating one value from amongaplurality of candidate values
`
`respectively associated with correction values that correct a control value to use ina
`
`closed loop control of the transmission power (par.0396 “closed loop parameters
`
`betweendifferent beams for a UE”, par.0347 “power may be adjusted by the TPC
`
`command”, par.0458 “SRS transmission powers may be configured to be equal to a
`
`specific value among the N powervalues”, par.0445-0446 “Closed Loop Power
`
`Control’); and
`
`

`

`Application/Control Number: 16/643,766
`Art Unit: 2642
`
`Page 3
`
`a transmitter (par.0487 “RF unit 1423”), which, in operation, transmits the uplink
`
`signal with the transmission power(par.0347 “PUCCH power.....PUSCH or SRS
`
`power....UE transmission power”), wherein
`
`a first correction value and a second correction value having alarger step size
`
`than the first correction value are associated with each of the plurality of candidate
`
`values (par.0347 “SRS...... small step size of TPC values. On the other hand...... using
`
`relatively large step size of TPC values”, par.0458 “SRS transmission powers may be
`
`configured to be equal to a specific value among the N power values”).
`
`Regarding claim 2, Park discloses within a predetermined period from a beam
`
`switch, the circuitry, in operation, computes the transmission power by using the second
`
`correction value corresponding to the candidate value indicated by the transmission
`
`power control information (par.0370 “information indicating when the specific power
`
`offset value is to be applied. For example, when switching periodicity related
`
`information of beam switching’), and in a period outside the predetermined period, the
`
`circuitry, in operation, computes the transmission power by using the first correction
`
`value corresponding to the candidate value indicated by the transmission power control
`
`information (par.013 “the transmission power....independently....transmission interval’,
`
`par.466 “the power control adjustment may be performed independently for each
`
`specific interval’, par.0475).
`
`Regarding claim 3, Park discloses within a predetermined period from a beam
`
`switch between different transmission and reception points, the circuitry, in operation,
`
`computes the transmission power by using the second correction value corresponding
`
`to the candidate value indicated by the transmission power control information
`
`

`

`Application/Control Number: 16/643,766
`Art Unit: 2642
`
`Page 4
`
`(par.0444 “additional poweroffset/bias values... ULPC processes A and B maytarget
`
`different reception points”), and within the predetermined period from a beam switch at
`
`the same transmission and reception point, the circuitry, in operation, computes the
`
`transmission power by using the first correction value corresponding to the candidate
`
`value indicated by the transmission powercontrol information.
`
`Regarding claim 4, Park discloses the second correction value further includes a
`
`third correction value and a fourth correction value having a larger step size than the
`
`third correction value, and within a predetermined period from a beam switch at the
`
`same transmission and reception point, the circuitry, in operation, computes the
`
`transmission power by using the third correction value corresponding to the candidate
`
`value indicated by the transmission powercontrol information, and within the
`
`predetermined period from a beam switch between different transmission and reception
`
`points, the circuitry, in operation, computes the transmission power by using the fourth
`
`correction value corresponding to the candidate value indicated by the transmission
`
`power control information (par.0354-0355 “additional power offset to be applied on the
`
`TPC accumulation whenever beam change or switching occurs”, par.0365 “a specific
`
`power offset value....to be added to a powercontrol process”, par.0370 “a beam
`
`switching...switching periodicity....the power offset values may be configured to be
`
`applied”, par.0372-0373).
`
`Regarding claim 6, Park discloses the uplink signal is an uplink data channel
`
`signal (par.078).
`
`

`

`Application/Control Number: 16/643,766
`Art Unit: 2642
`
`Page 5
`
`Regarding claim 7, Park discloses the uplink signal is a sounding reference
`
`signal SRS (par.0458).
`
`Regarding claim 8, Park discloses the uplink signal is a sounding reference
`
`signal (SRS) used to estimate channel state information CSI (par.009-010).
`
`Regarding claim 9, Park disclosesthe circuitry, in operation, computes the
`
`transmission power of the SRS by using the second correction value corresponding to
`
`the candidate value indicated by the transmission power control information received in
`
`all downlink control information formats that indicate transmission of the SRS
`
`(par.0347).
`
`Regarding claim 10, Park disclosesthe circuitry, in operation, computes the
`
`transmission power of the SRS by using the second correction value corresponding to
`
`the candidate value indicated by the transmission power control information received in
`
`a subsetof downlink control information formats that indicate transmission of the SRS
`
`(par.0347 “DCI format 3/3A’).
`
`Regarding claim 11, Park discloses a class of the subset of downlink control
`
`information formats is a format class that indicates transmission of the SRS and an
`
`uplink data channel or a format class that indicates transmission of the SRS (par.0347
`
`“DCI format 3/3A’).
`
`Allowable Subject Matter
`
`Claim 5 objected to as being dependent upon a rejected base claim, but would
`
`be allowable if rewritten in independent form including all of the limitations of the base
`
`claim and anyintervening claims.
`
`

`

`Application/Control Number: 16/643,766
`Art Unit: 2642
`
`Page 6
`
`Conclusion
`
`Any inquiry concerning this communication or earlier communications from the
`
`examiner should be directed to Examiner Tu Nguyen whose telephone number is
`
`(571)272-7883. The examiner can normally be reached on 8AM-5PM Eastern Time.
`
`Examiner interviews are available via telephone, in-person, and video
`
`conferencing using a USPTO supplied web-based collaboration tool. To schedule an
`
`interview, Applicant is encouraged to use the USPTO Automated Interview Request
`
`(AIR) at http:/Wwww.uspto.gov/interviewpractice.
`
`If attempts to reach the examiner by telephone are unsuccessful, the examiner's
`
`supervisor Rafael Perez-Gutierrez can be reached on 571-272-7915. The fax phone
`
`number for the organization where this application or proceeding is assigned is 571-
`
`273-8300 or mailed to:
`
`Commisioner for Patents
`
`P.O. Box 1450
`
`Alexandria, VA 22313-1450
`
`Hand-delivered responses should be brought to
`
`Customer Service Window
`
`Randolph Building
`
`401 Delany Street
`
`Alexandria, VA 22314
`
`

`

`Application/Control Number: 16/643,766
`Art Unit: 2642
`
`Page 7
`
`Information regarding the status of an application may be obtained from the Patent
`
`Application Information Retrieval (PAIR) system. Status information for published applications
`
`may be obtained from either Private PAIR or Public PAIR. Status information for unpublished
`
`applications is available through Private PAIR only. For more information about the PAIR system,
`
`see http://pair-direct.uspto.gov. Should you have questions on accessto the Private PAIR system,
`
`contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free).
`
`If you would like
`
`assistance from a USPTO Customer Service Representative or access to the automated
`
`information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000.
`
`/TU X NGUYEN/
`Primary Examiner, Art Unit 2642
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket