`
`UNITED STATES DEPARTMENT OF COMMERCE
`United States Patent and TrademarkOffice
`Address; COMMISSIONER FOR PATENTS
`P.O. Box 1450
`Alexandria, Virginia 22313-1450
`
`16/648,905
`
`03/19/2020
`
`Fumiiki YONEDA
`
`AOYA.12PUS01
`
`5640
`
`MARKD. SARALINO (PAN)
`RENNER, OTTO, BOISSELLE & SKLAR, LLP
`1621 EUCLID AVENUE
`ISTH FLOOR
`
`CLEVELAND, OH 44115
`
`IMTIAZ, ZOHEB 8
`
`2846
`
`04/15/2021
`
`ELECTRONIC
`
`Please find below and/or attached an Office communication concerning this application or proceeding.
`
`The time period for reply, if any, is set in the attached communication.
`
`Notice of the Office communication was sent electronically on above-indicated "Notification Date" to the
`following e-mail address(es):
`
`ipdocket @rennerotto.com
`
`PTOL-90A (Rev. 04/07)
`
`
`
`
`
`Disposition of Claims*
`1-5 is/are pending in the application.
`)
`Claim(s)
`5a) Of the above claim(s) ___ is/are withdrawn from consideration.
`C} Claim(s)
`is/are allowed.
`Claim(s) 1-5 is/are rejected.
`S)
`) © Claim(s)____is/are objected to.
`Cj) Claim(s
`are subjectto restriction and/or election requirement
`)
`S)
`* If any claims have been determined allowable, you maybeeligible to benefit from the Patent Prosecution Highway program at a
`participating intellectual property office for the corresponding application. For more information, please see
`http://www.uspto.gov/patents/init_events/pph/index.jsp or send an inquiry to PPHfeedback@uspto.gov.
`
`) )
`
`Application Papers
`10)() The specification is objected to by the Examiner.
`11) The drawing(s) filed on 19 March 2020 is/are: a)(¥) accepted or b){) objected to by the Examiner.
`Applicant may not request that any objection to the drawing(s) be held in abeyance. See 37 CFR 1.85(a).
`Replacement drawing sheet(s) including the correction is required if the drawing(s) is objected to. See 37 CFR 1.121 (d).
`
`Priority under 35 U.S.C. § 119
`12) Acknowledgment is made of a claim for foreign priority under 35 U.S.C. § 119(a)-(d)or (f).
`Certified copies:
`_—_c)L) None ofthe:
`b)L) Some**
`a)¥) All
`1.4) Certified copies of the priority documents have been received.
`2.2) Certified copies of the priority documents have been received in Application No.
`3.2.) Copies of the certified copies of the priority documents have been receivedin this National Stage
`application from the International Bureau (PCT Rule 17.2(a)).
`* See the attached detailed Office action for a list of the certified copies not received.
`
`Attachment(s)
`
`1)
`
`Notice of References Cited (PTO-892)
`
`Information Disclosure Statement(s) (PTO/SB/08a and/or PTO/SB/08b)
`2)
`Paper No(s)/Mail Date
`3/19/2020;9/14/2020;10/19/2020.
`U.S. Patent and Trademark Office
`
`3) (J Interview Summary (PTO-413)
`Paper No(s)/Mail Date
`(Qj Other:
`
`4)
`
`PTOL-326 (Rev. 11-13)
`
`Office Action Summary
`
`Part of Paper No./Mail Date 20210408
`
`Application No.
`Applicant(s)
`16/648,905
`YONEDAetal.
`
`Office Action Summary Art Unit|AIA (FITF) StatusExaminer
`ZOHEB S IMTIAZ
`2846
`Yes
`
`
`
`-- The MAILING DATEofthis communication appears on the cover sheet with the correspondence address --
`Period for Reply
`
`A SHORTENED STATUTORY PERIOD FOR REPLYIS SET TO EXPIRE 3 MONTHS FROM THE MAILING
`DATE OF THIS COMMUNICATION.
`Extensions of time may be available underthe provisions of 37 CFR 1.136(a). In no event, however, may a reply betimely filed after SIX (6) MONTHSfrom the mailing
`date of this communication.
`If NO period for reply is specified above, the maximum statutory period will apply and will expire SIX (6) MONTHSfrom the mailing date of this communication.
`-
`- Failure to reply within the set or extended period for reply will, by statute, cause the application to become ABANDONED (35 U.S.C. § 133}.
`Any reply received by the Office later than three months after the mailing date of this communication, evenif timely filed, may reduce any earned patent term
`adjustment. See 37 CFR 1.704(b).
`
`Status
`
`1) Responsive to communication(s) filed on 19 March 2020.
`C} A declaration(s)/affidavit(s) under 37 CFR 1.130(b) was/werefiled on
`
`2a)L) This action is FINAL. 2b)¥)This action is non-final.
`3)02 An election was madeby the applicant in responseto a restriction requirement set forth during the interview
`on
`; the restriction requirement and election have been incorporated into this action.
`4\0) Since this application is in condition for allowance except for formal matters, prosecution as to the merits is
`closed in accordance with the practice under Exparte Quayle, 1935 C.D. 11, 453 O.G. 213.
`
`
`
`Application/Control Number: 16/648,905
`Art Unit: 2846
`
`Page 2
`
`Notice of Pre-AlA or AIA Status
`
`The present application,filed on or after March 16, 2013, is being examined under the first
`
`inventorto file provisions of the AIA.
`
`Claim Rejections - 35 USC § 102
`
`The following is a quotation of the appropriate paragraphsof 35 U.S.C. 102 that form the basis
`
`for the rejections under this section made in this Office action:
`
`A person shall be entitled to a patent unless —
`
`(a)}(2} the claimed invention was described in a patent issued under section 151, orinanapplication
`for patent published or deemed published under s ection 122(b), in which the patent or application, as
`the case maybe, names another inventor and was effectively filed before the effectivefiling date of
`the claimed invention.
`
`Claims 1-5 are rejected under 35 U.S.C. 102(a)(2) as being anticipated by Murty US Patent No.:
`
`4,544,868.
`
`Regarding claims 1 and 4, Murty teaches, a controlcircuit (col.1, lines 4-6, motor
`
`controller) for an electric tool, the electric tool comprising a permanent magnet synchronous
`
`motor (motor 18, figure 1), a plurality of switching elements (power transistors 20, 22, 24, 26,
`
`28 and 30, figure 1), and a PWMinverter circuit (ful-wave bridge inverter 18, figure 1) that
`
`drives the permanent magnet synchronous motor, wherein the control circuit comprises a
`
`current detector (shunt resistor 96, figure 1) that detects a current flowing through the PWM
`
`inverter circuit (col.3, lines 45-50), and wherein, when braking the permanent magnet
`
`synchronous motor, the control circuitlimits a current flowing (ai. 7 ines 25-56 element OC
`
`line current reference level, fig. § A, 68} through the permanent magnet synchronous motor
`
`(fg. 6B elementia phase currentin winding A} and the PWMinverter circuit, toa
`
`predetermined currentlimit value {ca!. 7 tines 25-56, ig. SAand 6B element iref}.
`
`
`
`Application/Control Number: 16/648,905
`Art Unit: 2846
`
`Page 3
`
`Regarding claim 2, Murty teaches, the control circuit for the electric tool as
`
`claimed in claim 1, wherein the PWM inverter circuit is provided between the permanent
`
`magnet synchronous motor and a battery (battery 16, see figure 1, where the PWM
`
`inverter is between the motor and the battery), and wherein the control circuit boosts
`
`an induced electromotive voltage of the permanent magnet synchronous motor by
`
`switching low-side switching elements or high-side switching elements of the PWM
`
`inverter circuit during braking of the permanent magnet synchronous motor, and
`
`regenerates a regenerative current to the battery (figure 6, col.7, lines 25-26).
`
`Regarding claim 3, Murty teaches, the control circuit for the electric tool as
`
`claimed in claim 1, wherein the control circuit changes the current limit value according
`
`to an operation modeof the electric tool (col. 8, lines 13-30).
`
`Regarding claim 5, Murty teaches, An electric tool comprising a battery
`
`(battery 16, figure 1) , a permanent magnet synchronous motor (motor 18, figure 1), a
`
`plurality of switching elements (power transistors 20, 22, 24, 26, 28 and 30, figure 1), and
`
`a PWMinverter circuit (full-wave bridge inverter 18, figure 1) that drives the permanent
`
`magnet synchronous motor, wherein the electric tool comprises a control circuit (col.1,
`
`lines 4-6, motor controller) for the electric tool, wherein the control circuit comprises a
`
`current detector (shunt resistor 96, figure 1) that detects a current flowing through the
`
`PWM inverter circuit (col.3, lines 45-50), and wherein, when braking the permanent
`
`magnet synchronous motor, the control circuit limits a current flowing (est. 7 ines 25-86
`
`glement DC line current reference level, fig. 6 4,68) through the permanent magnet
`
`synchronous motor and the PWM inverter circuit (fig. 6B slement la phase current
`
`
`
`Application/Control Number: 16/648,905
`Art Unit: 2846
`
`Page 4
`
`in winding 4}, to a predetermined currentlimit value {eco!. 7 Hines 25-86, fig. SAand 68
`
`siement ref).
`
`Conclusion
`
`Anyinquiry concerning this communication or earlier communications from the examiner
`
`should be directed to ZOHEB S IMTIAZ whose telephone number is (571)272-4308. The examiner can
`
`normally be reached on 11am-730pm.
`
`Examiner interviews are available via telephone, in-person, and video conferencing using a
`
`USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use
`
`the USPTO Automated Interview Request (AIR) at http://www. uspto. gov/interviewpractice.
`
`If attempts to reachthe examiner by telephone are unsuccessful, the examiner’s supervisor,
`
`Eduardo Colon Santana canbe reachedon 571-272-2060. The fax phone number for the organization
`
`wherethis application or proceedingis assigned is 571-273-8300.
`
`Information regarding the status of an application may be obtained from the Patent Application
`
`Information Retrieval (PAIR) system. Status information for published applications may be obtained
`
`from either Private PAIR or Public PAIR. Status information for unpublished applications is available
`
`through Private PAIR only. For more information about the PAIR system, see https://ppair-
`
`my.uspto. gov/pair/PrivatePair. Should you have questions on accessto the Private PAIR system, contact
`
`the Electronic Business Center (EBC) at 866-217-9197 (toll-free). Ifyou would like assistance from a
`
`USPTO Customer Service Representative or access to the automated information system, call 800-786-
`
`9199 (IN USA OR CANADA)or 571-272-1000.
`
`
`
`Application/Control Number: 16/648,905
`Art Unit: 2846
`
`/ZOHEB SIMTIAZ/
`Examiner,Art Unit 2846
`
`Page5S
`
`