`
`17/052,408 ~ GAU: 2467
`
`ATTY. DOCKET NO
`
`733456.607USPC
`
`Sheet 1 of 1
`
`APPLICATION NO.
`
`INFORMATION DISCLOSURE STATEMENT
`(Use several sheets if necessary)
`
`Tetsuya YAMAMOTO
`FILING DATE
`
`GROUP ART UNIT
`
`*EXAMINER
`
`DOCUMENT NUMBER
`
`U.S. PATENT DOCUMENTS
`KIND
`
`AME
`
`PATENT AND TRADEMARK OFFICE
` U.S, DEPARTMENT OF COMMERCE
`
`
`
`
`
`NETAL |Pocowesrwunen CODE pee{|__ne IFAPPROPRIATE
`FILING DATE
`
`
`oisorsiass|At_[osr20n9f 1|2019/0191443
`
`
`FOREIGN PATENT DOCUMENTS
`
`Pages, Columns, Lines
`
`RelevantFigures Appear
`NO
`
`Corresponds to U.S.
`2019/0191443 Al
`
`
`
`2017/195653
`
`
`
`cove
`
`11/16/17
`
`WO (With English
`Abstract)
`
`
`
`
`
`NON-PATENT LITERATURE DOCUMENTS(/ncluding Author, Title, Date, Pertinent Pages, Etc.)
`3GPP TS 38.211 V15.1.0, “3rd Generation Partnership Project; Technical Specification Group
`Radio Access Network; NR; Physical channels and modulation (Release 15),” March 2018, 91
`
`3GPP TS 38.213 V15.1.0, “3rd Generation Partnership Project; Technical Specification Group
`Radio Access Network; NR; Physical layer procedures for control (Release 15),” March 2018, 77
`
`International Search Report, dated March 19, 2019, for corresponding International Application
`No. PCT/JP2019/000368, 4
`LG Electronics, “Discussion on multiplexing UL transmission with different requirements,” R1-
`1804572, Agenda Item: 7.2.4, 3GPP TSG RAN WGI Meeting #92bis, Athens, Greece, April 16-
`
`Mitsubishi Electric, “Discussions on UL multiplexing,” R1-1804947, Agenda Item: 7.2.4 Study of
`handling UL multiplexing of transmissions with different reliability requirements, 3GPP TSG
`RAN WGI Meeting #92b, Chennai, China, April 16-20, 2018, 6
`Vivo, “Summary of handling UL multiplexing of transmission with different reliability
`requirements,” R1-1803359, Agenda Item: 7.2.4, 3GPP TSG RAN WGI Meeting #92, Athens,
`Greece, February
`26-March 2, 2018, 4
`ZTEet al., “UL multiplexing of transmissions with different reliability requirements,” R1-
`1803803, Agenda Item: 7.2.4, 3GPP TSG RAN WGI Meeting #92bis, Sanya, China, April 16-20,
`
`EXAMINER
`
`DATE CONSIDERED
`
`03/20/2022
`
`/GAUTAM SHARMA/
`
`* EXAMINER: _
`
`Initial if reference considered, whetherornotcitation is in conformance with MPEP 609. Draw line throughcitation if not in
`conformance and not considered. Include copy of this form with next communication to applicant.
`
`7639353_1
`
`November 2, 2020
`
`ALL REFERENCES CONSIDERED EXCEPT WHERE LINED THROUGH.
`
`/G.8/
`
`