`Reply to Office Action of June 27, 2022
`
`Docket No.: 065933-0796
`
`AMENDMENTS TO THE SPECIFICATION
`
`Please amend paragraph [0010] of the specification as originally filed as follows:
`
`[0010] Fig. 1 is a schematic cross-sectional view of a main portion of an impactrotary tool
`
`according to an embodiment.
`
`Fig. 2(a) is a front perspective view of a main hammer, Fig. 2(b) is a perspective view of
`
`a spindle and a carrier, and Fig. 2(c) is a rear perspective view of a sub-hammer.
`
`Fig. 3 is a diagram showing a state where the main hammeris assembled into the sub-
`
`hammer.
`
`Fig. 4 is an enlarged view of a connection structure of the sub-hammerand the main
`
`hammer.
`
`Fig. 5 is a diagram showing an analysis result of the behaviors of a torque estimated from
`
`a sensor detection value and an actually applied tightening torque.
`
`Fig. 6 shows diagrams explaining an operation of the impact rotary tool according to an
`
`embodiment.
`
`Please amend paragraph [0029] of the specification as originally filed as follows:
`
`[0029] The anvil 22 that engages with the main hammer 20 is madeofsteel, and is rotatably
`
`supported by the housing 2 via a slide bearing madeofsteel or brass. The tip of the anvil 22 is
`
`provided with a tool mounting portion 22a having a quadrangular cross-section for mounting a
`
`tip tool 100 to be mounted on a head of a hexagonbolt or a hexagonnut (tightened member 200),
`
`as shown in FIG. 6. There is a circumferential clearance (play) between the anvil and a tip tool
`
`100 (clearance P1) and betweenthe tip tool and a tightened member 200 (clearance P2), as
`
`shown in FIG. 6.
`
`Please amend paragraph [0034] of the specification as originally filed as follows:
`
`[0034] According to the analysis result, in the line L1, at the time tl, the hammer has an impact
`
`on the anvil, and the torque sensor 25 detects the twisting strain of the anvil. The anvil closes the
`
`circumferential clearance (P1+P2 as shownin FIG. 6) existing between the bolt and the anvil
`
`during a period from the time t1 to the time t2. Asaresult, in the line L2, the actual tightening
`
`torque is applied to the bolt at the timet2.
`
`